FIELD: ice-breaking jobs. SUBSTANCE: submarine vessel 2 excites resonance flexural gravitational waves 3 in ice 1 during her motion at resonance speed. After excitation of resonance flexural gravitational waves 3, speed of vessel 2 is reduced and at the moment when conning tower 5 of vessel reaches first oscillation loop 4 determined by means of echo sounder 6, speed of vessel is again increased to previous magnitude and conning tower planes 8 are placed in vertical position. EFFECT: enhanced efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2175295C1 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2198985C2 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2198983C2 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2175294C1 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2194117C2 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2171201C1 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2175296C1 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2233228C2 |
METHOD OF BREAKING ICE COVER | 1999 |
|
RU2143372C1 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2233227C2 |
Authors
Dates
2003-02-20—Published
2000-06-06—Filed