FIELD: designing and building of submarines, pipe lines and other envelope structures used under water. SUBSTANCE: submarine hull prestressed preliminarily by constant force includes envelope and strength members used for constant force of prestressing. Rings of rectangular section are fitted inside envelope. Strength members are arranged between rings and envelope which may be used as primary structural member working under water at high hydrostatic pressure. EFFECT: enhanced efficiency and reliability. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
BRACING TO FORM CONSTANT THRUST IN SUSPENSION STRUCTURES UNDER TEMPERATURE AND OTHER DISPLACEMENTS | 2000 |
|
RU2186899C2 |
VEHICLE FRAME UNIT FATIGUE TESTER | 2000 |
|
RU2188406C1 |
WAY TO TEST ARTICLES FOR TIGHTNESS | 2002 |
|
RU2206879C1 |
SUCKER-ROD DEEP-WELL PUMPING UNIT | 2002 |
|
RU2224909C2 |
VIBRATING MIXER | 2002 |
|
RU2216395C2 |
DIFFERENTIAL MECHANISM | 2001 |
|
RU2216666C2 |
THREE-DIMENSIONAL COLLAPSIBLE FRAME | 2006 |
|
RU2304671C1 |
SET TO TEST MATERIALS FOR LONG-DURATION STRENGTH | 2002 |
|
RU2219520C2 |
BIPLASTIC BEAM | 2013 |
|
RU2535865C1 |
BENCH TESTING GEAR TRANSMISSIONS ACCORDING TO ARRANGEMENT OF CLOSED CIRCUIT | 2002 |
|
RU2221997C1 |
Authors
Dates
2003-03-10—Published
2000-11-28—Filed