FIELD: construction engineering, particularly, devices for preparation of concrete mixes. SUBSTANCE: complex includes mixing drum, transformation tracks parallel to each other, hoisting mechanism connecting vehicles and mixing drum. Hoisting mechanism is made in form of overhead-track hoist secured to mine working roof with grab unit. Mixing drum with drive and reducing gear is installed on platform secured to mine working floor. Mixing drum due to internal guides is made for continuous preparation and unloading of concrete mix into vehicles. Section of complex parallel tracks is connected with main mine tracks and made for providing of continuous delivery of loose materials and dispatching of concrete mixes in vehicles. Vehicle with cement has air-driven pump for controlled supply of cement from vehicle to mixing drum. Vehicle with concrete mix has metering device in form of air ejector and screw conveyors. EFFECT: higher efficiency and operate reliability of complex mechanisms for preparation of concrete mix. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINE WORKING AIR ISOLATION | 2000 |
|
RU2187652C2 |
PROCESS OF UNDERGROUND DEVELOPMENT OF THICK ORE DEPOSITS | 2001 |
|
RU2203419C2 |
METHOD OF DAMPING SHOCK AIR WAVES AND NEUTRALIZATION OF EXPLOSION PRODUCTS | 2001 |
|
RU2192545C2 |
METHOD OF FILLING OF ROOM WORKED-OUT SPACE IN MINERAL UNDERGROUND MINING | 2001 |
|
RU2215144C2 |
CONCRETE PLACER CHARGING SYSTEM | 1994 |
|
RU2128288C1 |
METHOD OF MINING OF THICK ORE DEPOSITS | 2000 |
|
RU2186979C2 |
METHOD FOR UNDERGROUND LOADING OF PNEUMATIC CONCRETE MACHINE | 0 |
|
SU1795108A1 |
METHOD OF CLEANING UNDERGROUND WATER SUMPS FROM SLUDGE | 1997 |
|
RU2131959C1 |
METHOD FOR FILLING AND PROTECTING EXCAVATED SPACE DURING SUBTERRANEAN EXCAVATION OF MINERAL DEPOSITS | 2002 |
|
RU2232900C2 |
PROCESS OF PREPARING BOTTOMS OF CHAMBERS OR BLOCKS | 2000 |
|
RU2174601C1 |
Authors
Dates
2003-06-10—Published
2001-06-04—Filed