FIELD: construction industry, encasement of various structures in monolithic concrete with stage-by-stage erection of elements. SUBSTANCE: process includes cutting of structure into blocks, heating of foundation before laying concrete mixture, laying of concrete mixture into forms, its subsequent vibration and curing of concrete in forms till it acquires required strength. Novelty of process lies in heating of foundation to temperature of 10-20 C and in casting of concrete mixture with temperature of 20-25 C into forms to height 0.4-0.7 m and in laying of concrete mixture with temperature of 6-10 C to the rest of structure height. Permitted length of block encased in concrete is found by given dependence. EFFECT: diminished probability of crack formation and increased construction rate. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TUNNEL TYPE POURED-IN-PLACE STRUCTURE CONCRETING IN ENLARGED BLOCKS WITH STEP-IN-STEP STRUCTURE COMPONENT ERECTION IN TOP-BOTTOM DIRECTION | 2003 |
|
RU2246588C1 |
METHOD FOR CONCRETING OF MONOLITHIC STRUCTURES WITH DIFFERENT-MASS COMPONENTS | 1998 |
|
RU2143047C1 |
PROCESS OF ERECTION OF MONOLITHIC REINFORCED CONCRETE BRIDGE SUPPORTS-WALLS | 2001 |
|
RU2208082C2 |
PROCESS OF ENCASEMENT OF MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURE EXTENDED IN AREA IN CONCRETE | 2001 |
|
RU2208083C2 |
PROCESS OF ERECTION OF FLOORS OF MONOLITHIC REINFORCED BUILDING STRUCTURES | 2001 |
|
RU2206679C2 |
PROCESS OF LAYING CONCRETE ON MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURES EXTENDED IN AREA | 2001 |
|
RU2211892C2 |
METHOD OF WARMING OF MONOLITHIC CONSTRUCTIONS BEFORE RESUMPTION OF CONCRETE PLACEMENT | 1996 |
|
RU2100543C1 |
PORTABLE FORM | 0 |
|
SU1661430A1 |
METHOD FOR CONSTRUCTION OF IN-SITU REINFORCED CONCRETE SHELLS | 0 |
|
SU1629438A1 |
SHUTTERING PANEL | 1998 |
|