FIELD: systems of monitoring and accounting in ail production. SUBSTANCE: plant has separator with hydrocyclone head, float level gage and pipelines supplying gas-fluid mixture and discharging gas and fluid, gas flow controller installed in pipeline for gas discharging and connected with float level gage, and fluid flowmeter installed in pipeline for fluid discharging. Plant has pipeline communicating gas zone of hydrocyclone head with pipeline for gas discharging accommodating drip pan with pipeline for return of trapped fluid to separator vessel. Pipeline for fluid discharging is directly connected to flowmeter. Said pipeline is communicated with separator perforated branch pipe for continuous withdrawal of fluid from separator vessel. EFFECT: increased accuracy of plant operation and plant simplified design. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDROCYCLONE SEPARATION PLANT | 2001 |
|
RU2196642C1 |
METHOD AND INSTALLATION FOR FLOW RATE MEASUREMENT OF PRODUCTS FROM GAS-CONDENSATE AND OIL WELLS | 2013 |
|
RU2532490C1 |
UNIT FOR MEASURING PRODUCTION RATES OF GAS CONDENSATE AND OIL WELLS AND METHOD FOR ITS OPERATION | 2022 |
|
RU2799684C1 |
METHOD FOR MEASUREMENTS OF DEBITS, MONITORING AND CONTROL OF OIL WELL PRODUCTION TECHNOLOGY AND INSTALLATION FOR ITS REALISATION | 2008 |
|
RU2365750C1 |
SEPARATION TANK FOR WELL MEASUREMENT UNITS | 2020 |
|
RU2750371C1 |
METHOD AND INSTALLATION FOR MEASURING LIQUID AND GAS COMPONENTS OF OIL, GAS AND GAS-CONDENSATE WELLS | 2017 |
|
RU2671013C1 |
PORTABLE METERING STATION OF EXTRACTED WELL LIQUID | 2014 |
|
RU2552563C1 |
CONTROL METHOD OF LIQUID AND GAS PHASES REMOVAL FROM SEPARATION TANK | 2018 |
|
RU2685441C1 |
MOBILE STANDARD OF THE 2ND DISCHARGE FOR VERIFICATION OF WELL MEASUREMENT UNITS | 2020 |
|
RU2749256C1 |
HYDROCYCLONE SEPARATION UNIT FOR PRELIMINARY TREATMENT OF WELL FLUID | 2023 |
|
RU2809323C1 |
Authors
Dates
2003-07-10—Published
2001-10-22—Filed