FIELD: mining art, applicable at destruction of rocks. SUBSTANCE: the main difference from the known methods for blasting crushing of rocks is the placement of the explosive charge with at least one spacing relative to the hole wall in its length, the charge volume makes up 0.3 to 0.95 of the volume of the hole active section; the cross-section area of the explosive charge is selected proceeding from condition S3=(1,13-2,84)r
Title | Year | Author | Number |
---|---|---|---|
EXPLOSIVE CHARGE (MODIFICATIONS) | 1999 |
|
RU2152586C1 |
METHOD OF PREPARING WATER-CONTAINING BLASTING MATERIAL CHARGE, WATER-CONTAINING LIQUID (OPTIONS), AND WATER-CONTAINING BLASTING MATERIAL | 2004 |
|
RU2279419C2 |
DRILLING AND BLASTING OPERATIONS AT OPEN PITS | 2013 |
|
RU2517289C1 |
METHOD FOR LAYING OF HOSES AND DEVICE FOR PLACING OF EXPLOSIVE IN HOLE | 2004 |
|
RU2317518C2 |
DEVICE FOR FILLING OF DOWN WELLS WITH SUBSTANCE IN SLEEVE | 2013 |
|
RU2571317C2 |
METHOD OF FORMING WATER-FILLED EXPLOSIVE AND WATER-FILLED EXPLOSIVE CHARGE, WATER- FILLED EXPLOSIVE (OPTIONS) | 2001 |
|
RU2207331C2 |
METHOD OF EXPLOSION-BREAKING OF ROCK | 0 |
|
SU891915A1 |
METHOD OF BLAST-HOLE DRILLING ENSURING PRESET EXTENT OF BLAST ROCK GRINDING | 2010 |
|
RU2450242C1 |
CHARGING SHAPING UNIVERSAL HOSE | 2024 |
|
RU2823362C1 |
PROCESS OF POSITIONING OF SUBSTANCE IN HOSE IN DOWNGOING HOLE | 1997 |
|
RU2132040C1 |
Authors
Dates
2003-07-10—Published
2000-11-27—Filed