FIELD: exploitation of underwater deposits of mainly liquid and gaseous mineral resources under arctic conditions, installation of underwater process complexes for performance of work by method of cluster drilling irrespective of weather conditions and presence of ice cover. SUBSTANCE: method includes engagement of bottom plate with wellhead connectors to which X-mass tree structure is secured through means of leakproof joint by aligning of releasable connections. Secured to X-mass tree through leakproof joint with regulation of height by compensator. Then well is drilled by giving commands from panel of drilling ship control post. Upon completion of drilling, lowered into well through drilling equipment and X-mass tree structure is pipe support unit above which channel unit is arranged in X-mass tree structure. Drilling equipment is dismantled. EFFECT: reduced labor input in complex installation due to its simple design and reduced time of its installation. 4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION AND TECHNOLOGICAL COMPLEX OF UNDERWATER MINERAL MINING | 1998 |
|
RU2140516C1 |
PROCESSING SYSTEM FOR SEA CLUSTER DRILLING | 2019 |
|
RU2731010C1 |
SUBSEA WELLHEAD EQUIPMENT FOR OPERATION OF WELL CLUSTER | 1991 |
|
RU2017933C1 |
UNDERWATER RIG FOR DEVELOPMENT OF HYDROCARBONS (OIL AND GAS) DEPOSITS IN ARCTIC SHELF | 2012 |
|
RU2507382C1 |
METHOD OF CONSERVATION, COMPLETION AND REPAIR OF WELL | 2004 |
|
RU2362005C2 |
DEVICE FOR DEEP-SEA DRILLING AND METHOD OF DEEP-SEA DRILLING | 2018 |
|
RU2694669C1 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
UNDERWATER DRILLING RIG AND SUPPORTING PLATFORM FOR IT | 1995 |
|
RU2081289C1 |
SYSTEM FOR OFFSHORE PRODUCTION OF OIL OR GAS (VERSIONS), SHIP, OFFSHORE BOTTOM UNIT AND METHOD OF APPLICATION OF SAID SYSTEM | 1997 |
|
RU2191888C2 |
RISER HINGE LINK | 2021 |
|
RU2785774C1 |
Authors
Dates
2003-07-27—Published
2001-04-23—Filed