FIELD: oils and gas production.
SUBSTANCE: group of inventions refers to methods and facilities for conservation, completion and repair of wells. The inventions facilitate control over the well during the said operations by means of assembling system of two partitions in well. Each of the partitions is located below the lower end of a flow string for well completion, when this string is installed into the well. As none of these partitions is installed higher in the borehole of the well, so both partitions rest in place during operations of conservation, completion and repair, which eliminates necessity to use a block of blowout preventers to facilitate reliable control over the well.
EFFECT: reduced cost of well construction due to reduced time required for operation of drilling rig.
44 cl, 23 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDROELECTRIC CONTROL SYSTEM OF COLUMN FOR DESCENT WITH BACKUP CONTROL SYSTEM OF SEQUENTIAL ACTIVATION WITH PRESSURE RELIEF INTO CAVITY OF WATER SEPARATION COLUMN | 2020 |
|
RU2763868C1 |
HYDRAULIC STRING CONTROL SYSTEM FOR LOWERING | 2020 |
|
RU2768811C1 |
METHOD FOR CONTROLLING THE LOWER COLUMN FOR DESCENT WITH SECURITY SYSTEM DUPLICATION | 2020 |
|
RU2773838C2 |
OFFSHORE WELL FOR OIL AND GAS RECOVERY WITH ABOVE-WATER PLACEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2566162C1 |
SYSTEM FOR OFFSHORE PRODUCTION OF OIL OR GAS (VERSIONS), SHIP, OFFSHORE BOTTOM UNIT AND METHOD OF APPLICATION OF SAID SYSTEM | 1997 |
|
RU2191888C2 |
METHOD FOR CONTROLLING THE LOWER STRING FOR DESCENT | 2020 |
|
RU2773834C2 |
RISER HINGE LINK | 2021 |
|
RU2785774C1 |
RISER BOOM | 2021 |
|
RU2776510C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
UNDERWATER DRILLING AND MINERAL MINING COMPLEX, METHOD OF ITS INSTALLATION AND ITS CONTROL SYSTEM | 2001 |
|
RU2209294C2 |
Authors
Dates
2009-07-20—Published
2004-08-06—Filed