FIELD: oil and gas producing industry; particularly, methods of detection of faulty sealing of flow string provided with tubing pipes. SUBSTANCE: method provides for registration of flow rate of pumped fluid by two flowmeters of similar design and calibrated at preset pressure. Fluid is pumped with help of autonomous pumping unit, for instance, of cementing pumping unit of TsA-320 m type. One of flowmeters is lowered into well below tubing funnel, and the other is cut in line of fluid pumping at wellhead. Faulty sealing of flow string is detected by difference in readings of said flowmeters. In this case, flowmeter included into line of fluid pumping at wellhead is placed in length of pipe whose diameter equals diameter tubing pipes lowered into well. EFFECT: higher accuracy of detection of flow string faulty sealing. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF FLOW STRING LEAKING IN INJECTION WELL EQUIPPED WITH TUBING | 2001 |
|
RU2211327C2 |
METHOD OF LEAKAGE TEST OF FLOW STRING OF INJECTION WELL EQUIPPED WITH TUBING (Versions) | 2000 |
|
RU2168622C1 |
METHOD FOR PRESSURE TEST OF TUBING STRING | 2011 |
|
RU2455479C1 |
METHOD OF PRODUCTION STRING SEALING | 2013 |
|
RU2520217C1 |
INSULATION METHOD OF WATER INFLUX AND WELL THIEF ZONE | 2008 |
|
RU2378490C1 |
METHOD OF INITIATING INFLOW FROM BED | 2011 |
|
RU2464416C1 |
METHOD FOR LIQUIDATION OF ABSORPTION ZONES IN WELL | 2010 |
|
RU2405927C1 |
METHOD FOR PERFORMING PULSE HYDRAULIC FRACTURING OF CARBONATE FORMATION | 2011 |
|
RU2460876C1 |
FLOW OUT METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF PRESSURE WELL | 2008 |
|
RU2366807C1 |
METHOD OF DETECTING CROSS-FLOWS IN WELL | 2008 |
|
RU2361079C1 |
Authors
Dates
2003-08-10—Published
2001-11-02—Filed