LENGTHY HOLLOW BUILDING STRUCTURE AND PROCESS OF ITS MANUFACTURE Russian patent published in 2003 - IPC

Abstract RU 2211899 C1

FIELD: construction industry, finishing of lengthy hollow building structures, for instance, beams and columns. SUBSTANCE: given building structure includes central bearing part, decorative thin-walled sheathing placed with clearance relative to central bearing part, supporting layer bordering on internal surface of decorative sheathing and partially filling space between decorative sheathing and central bearing part and power supports linking supporting layer to central bearing part. Supporting layer is made of reinforced foam plastic which reinforcing members are anchored on end sections of power supports with clearance relative to decorative sheathing and are completely covered with foam plastic. Supporting layer is adhesively coupled directly to internal surface of decorative sheathing. Process of manufacture of given building structure includes fabrication of central bearing part, attachment of power supports to it, fixing of supporting layer on power supports and anchoring of decorative sheathing on supporting layer. Supporting layer is formed from reinforced foam plastic with use of foaming self-hardening polymer material. To fix decorative sheathing on supporting layer reinforcing members are first anchored on end sections of power supports, then decorative sheathing is installed with clearance with reference to reinforcing members. Layer of non-hardened foaming polymer material with thickness exceeding clearance between reinforcing members and internal surface of decorative sheathing is applied to internal surface of decorative sheathing. Reinforcing members are embedded in non-hardened polymer material and decorative sheathing is fixed relative to reinforcing members till complete hardening of polymer material occurs. EFFECT: reduced cost of manufacture of hollow building structures. 23 cl, 14 dwg

Similar patents RU2211899C1

Title Year Author Number
CLOCK HAVING ORNAMENTAL HOUSING MADE OF PRECIOUS METAL, ORNAMENTAL HOUSING AND THIN-WALL ORNAMENTAL COVER MADE OF PRECIOUS METAL FOR SAID CLOCK AND METHOD OF MAKING CLOCK FROM PRECIOUS METAL 2013
  • Sanikidze Tengiz Amiranovich
RU2532957C2
CLOCK WITH DECORATIVE CASE OF PRECIOUS METALS, DECORATIVE CASE AND THIN-WALL DECORATIVE CASE OF PRECIOUS METAL FOR SAID CLOCK 2013
  • Sanikidze Tengiz Amiranovich
RU2553551C2
METHOD OF MAKING MULTILAYER DECORATIVE CASE OF THE ARTICLE 2014
  • Sanikidze Tengiz Amiranovich
RU2594768C2
COMPOSITION FOR SEALING INTERBOARD JOINTS AND THERMALLY INSULATING STRUCTURAL UNITS, AND HEAT-INSULATION SYSTEM 1999
  • Ovchinnikov E.N.
  • Kosmodem'Janskij L.V.
  • Rumjantsev V.A.
RU2157351C1
TECHNOLOGY OF CONSTRUCTION OF INDIVIDUAL HOUSES AND STRUCTURES 2019
  • Ivanov Anton Aleksandrovich
  • Barybin Aleksandr Petrovich
RU2717600C1
DOOR (VERSIONS) AND METHOD OF ITS MANUFACTURE, DOOR FRAME LEAF (VERSIONS) 2001
  • Levakov B.V.
RU2205266C2
ROLLED ROOFING MATERIAL AND METHOD FOR ITS MANUFACTURE 1999
  • Zhitnik Eh.V.
  • Zmievskij D.V.
RU2146322C1
METHOD OF MAKING LARGE-SIZE COMPOSITE ARTICLES BY VACUUM INFUSION AND COMPOSITE POWER BEAM OF BRIDGE SECTION FOR COLLAPSIBLE BRIDGE STRUCTURE 2018
  • Stepanov Evgenij Vladimirovich
  • Koshkin Andrej Sergeevich
  • Vanyukhin Arkadij Viktorovich
  • Ilinykh Konstantin Lvovich
RU2688716C1
THREE-LAYER PANEL OF HIGHER STRENGTH AND METHOD OF ITS MANUFACTURING 2009
  • Lysikov Anatolij Vladimirovich
  • Komarova Viktorija Anatol'Evna
  • Chapalda Dmitrij Ivanovich
RU2449091C2
HEAT INSULATED PIPE AND PIPELINE SECTION WITH SEALING SECTION AT OUTER SURFACE AND AT THE ENDS 2014
  • Pavljuk Evgenij Sergeevich
  • Narkevich Sergej Leonidovich
RU2576078C1

RU 2 211 899 C1

Authors

Safronov I.N.

Dates

2003-09-10Published

2002-05-24Filed