FIELD: mining industry; applicable in building-up of opencast non-mining flank in period of completion of operations with formation of high benches (45-70m). SUBSTANCE: method includes construction in adjacent levels of intersecting horizontal safety berms and spiral haulage berm. Platforms of intersection of steeply dipping safety berms with spiral haulage berm and occupying width equaling width of spiral haulage berm are located at depth from overlying level equaling 1/3 height of working bench, and sections of horizontal safety berms of last and but last levels from opencast bottom which are nonintersecting with spiral haulage berm are interconnected by construction of steeply dipping safety berm. EFFECT: higher efficiency of work involved in mining of deep opencasts due to increase of angle of inclination of opencast non-mining flank. 5 dwg, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING UP OF OPENCAST NONMINING FLANK | 2001 |
|
RU2206748C1 |
METHOD OF BUILDING-IP OF OPENCAST NONMINING FLANK | 2001 |
|
RU2209310C1 |
METHOD FOR NON-WORKING PIT WALL FORMING | 2004 |
|
RU2265126C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
METHOD FOR OPENING AND PROCESSING DEEP HORIZONS OF KIMBERLITE PIPES | 2003 |
|
RU2233982C1 |
METHOD OF COMBINED MINERAL DEPOSIT DEVELOPMENT | 2006 |
|
RU2331767C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
Authors
Dates
2003-09-27—Published
2002-04-10—Filed