FIELD: oil producing industry; applicable in development of oil pool with high water cutting of oil. SUBSTANCE: method includes injection of working agent through injection wells. Oil is withdrawn through producing wells. Operation of a part of wells is carried and under OPERATION-SHUTOFF cycle conditions. In one of semicycles SHUTOFF, located in well, in upper part of producing formation is seismoacoustic radiator. Seismoacoustic stimulation is carried out for 60-90 min. Seismoacoustic radiator is moved along producing interval with stopping every 1.0-1.5m for 60- 90 min for seismoacoustic stimulation. Upon completion of seismoacoustic stimulation, bottom-holes zones of producing wells with reduced water cutting of oil are subjected to intensified treatment. Operations are repeated in 6-50 months. EFFECT: reduced water cutting of oil and higher oil recovery from oil pool. 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1999 |
|
RU2137916C1 |
SEISMOACOUSTIC WELL BOTTOM TREATMENT METHOD | 2005 |
|
RU2272896C1 |
METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 1997 |
|
RU2111346C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2003 |
|
RU2247828C2 |
METHOD FOR HYDROCARBON DEPOSIT DEVELOPMENT ALONG WITH FORCE APPLICATION TO GEOLOGIC ENVIRONMENT | 2004 |
|
RU2268996C2 |
METHOD OF INCREASING OIL RECOVERY IN AREAS OF NON-STATIONARY WATER FLOODING | 2023 |
|
RU2817834C1 |
METHOD FOR EXTRACTION OF OIL RESERVOIR | 2003 |
|
RU2230894C1 |
METHOD FOR DEVELOPMENT OF OIL POOL | 1996 |
|
RU2121060C1 |
METHOD FOR BOTTOM-HOLE ZONE TREATMENT | 2011 |
|
RU2460872C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2108449C1 |
Authors
Dates
2003-10-10—Published
2003-02-11—Filed