FIELD: underground water development works, water proofing of flooded sections and mine workings, for instance, in coal mines. SUBSTANCE: bridge includes concrete wall contacting enclosing rocks, metal tube with limiting ribs, steel space reinforcement and ring seal. The latter comes in the form of heat-insulation elastic material in the form of U- shaped sections and lateral stiffening ribs. Limiting rib of metal tube with ring seal is positioned in face of bridge on side of attack by aggressive mine water. Area of surface of limiting rib of metal tube with ring seal is equal to area of face surface of bridge. Due to this direct contact of concrete with aggressive mine water is avoided. EFFECT: raised water-proofness of body of bridge thanks to prevention of direct contact between face surface of bridge and aggressive mine water. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRO-ISOLATION MINE PARTITION | 0 |
|
SU929875A1 |
METHOD OF WATERPROOFING OF MINING OPENINGS OF POTASH MINES | 2013 |
|
RU2530944C1 |
HYDRAULIC INSULATION PARTITION | 0 |
|
SU840411A1 |
SEALING INTERMEDIATES FOR SEPARATION OF MINE ISOLATED HORIZONTAL PROCESSING AND METHOD OF ITS FACILITIES | 2017 |
|
RU2645700C1 |
METHOD FOR WATERPROOFING OF MINE WORKINGS OF POTASSIUM MINES | 2016 |
|
RU2634760C1 |
WATERPROOFING STRUCTURE | 2023 |
|
RU2801986C1 |
WATERPROOFING STRUCTURE | 2022 |
|
RU2795491C1 |
METHOD OF WATERPROOFING MINE WORKINGS OF POTASSIUM MINES | 2018 |
|
RU2681760C1 |
METHOD OF MINE WORKING BOLTING | 1999 |
|
RU2160837C2 |
PRECAST SUPPORT OF VERTICAL SHAFT | 2011 |
|
RU2478789C1 |
Authors
Dates
2003-12-20—Published
2002-06-10—Filed