FIELD: petroleum extracting industry. SUBSTANCE: development method includes extraction from all supplying wells bored in deposit with lowering of their acceleration by no less than 70% of starting value and/or from all extracting wells with water denseness around extracted petroleum of no less than 80%. Periodical shutdown of wells operation is done in turn. Reaction of operating extracting wells is measured and controlled by quantity and/or speed and surrounding water denseness and/or gassing of extracted petroleum for determining wells for shutdown. Then reaction areas connected to shutdown of selected wells are determined. Then operating extracting wells are stimulated in determined areas by means of explosions done in turn in selected wells. Explosions are performed in wells near contour of selected areas. Explosions are pin-pointed with localization of their energy in the area of productive layer. For this in each of said wells water layer is opened with total area of perforation openings against this layer and productive layer equal to 30-75% of operating column cross-section area. In some wells explosions are performed against productive layer, in other wells explosions are performed against water layer. Some explosions are performed synchronously and/or in turn with one and/or different sides of each selected area and consequence of explosions is different relative to different layers. EFFECT: increased effectiveness of petroleum deposit development. 3 cl
Title | Year | Author | Number |
---|---|---|---|
DRIFTING PETROLEUM DEPOSIT DEVELOPMENT AT LATE STAGE WITH MAINTENANCE OF LAYER PRESSURE | 2003 |
|
RU2224098C1 |
PROCESS OF DEVELOPMENT OF OIL FIELD AT LATEST STAGE | 2003 |
|
RU2221137C1 |
HYDROCARBON DEPOSIT DEVELOPMENT METHOD IN THE MODE OF MULTIDIMENSIONAL INSTABILITY | 2003 |
|
RU2224097C1 |
PROCESS OF DEVELOPMENT OF DEPOSIT OF HYDROCARBONS | 2003 |
|
RU2223393C1 |
DRIFTING HETEROGENEOUS HIGH-VISCOUS PETROLEUM DEPOSIT DEVELOPMENT AT LATE STAGE | 2003 |
|
RU2224099C1 |
HYDROCARBON ACCUMULATION DEVELOPMENT METHOD | 2005 |
|
RU2267600C1 |
METHOD FOR HYDROCARBON DEPOSIT DEVELOPMENT AT LATER STAGE | 2005 |
|
RU2283945C1 |
METHOD OF SYSTEM DEVELOPMENT OF OIL POOL SINCE ITS EARLY STAGE | 2002 |
|
RU2209946C1 |
METHOD OF DROWNED OIL POOL DEVELOPMENT AT LATE STAGE | 2001 |
|
RU2197604C2 |
DEVELOPMENT METHOD OF NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2471971C1 |
Authors
Dates
2004-02-20—Published
2003-05-29—Filed