FIELD: oil and gas extracting industry. SUBSTANCE: method includes pass-by of excessive fluid by means of mounting a perforated pipe for forming an outlet passage. Inside the pipe elastic element is located. For compensating excessive pressure in pipeline during water freezing perforated pipe is placed inside the pipeline. Ends of said pipe are fixed by welding, and elastic element is made in form of elastic rubber cable. EFFECT: prevention of pipeline blowouts during seasonal temperature changes. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREVENTION OF FREEZING OF INJECTION WELL HEAD | 2001 |
|
RU2209933C1 |
INJECTION WELL REPAIR METHOD | 2004 |
|
RU2267596C1 |
PROCEDURE FOR PREVENTION OF WELLHEAD FREEZING IN PRESSURE WELL | 2010 |
|
RU2420655C1 |
METHOD OF FREEZING PREVENTION OF WATER-INJECTION WELL MOUTH | 2002 |
|
RU2213846C1 |
METHOD OF LEAKAGE TEST OF INJECTION WELL FLOW STRING | 2002 |
|
RU2214508C1 |
SHELTER ABOVE INJECTION WELL HEAD | 2011 |
|
RU2459929C1 |
FREEZING CONTROL METHOD OF WELLHEAD EQUIPMENT OF WATER-INJECTION WALL, AND VALVE FOR ITS IMPLEMENTATION | 2010 |
|
RU2438005C1 |
DEVICE FOR CEMENTING OF ADDITIONAL CASING STRING | 2002 |
|
RU2214503C1 |
CASING PIPE AIR-TIGHTNESS CONTROL DEVICE | 2005 |
|
RU2283940C1 |
WIRE ROPE SEALING DEVICE | 2002 |
|
RU2229049C2 |
Authors
Dates
2004-03-20—Published
2002-05-29—Filed