FIELD: construction; replacement of underground pipelines of different application.
SUBSTANCE: according to proposed method, new pipeline is pulled in place of cold pipeline to be replaced through flexible corrugated heat-insulated hose. Hot air is delivered between heat-insulated hose and new pipeline to heat it to temperature not higher than temperature of beginning of plastic deformation of material of new pipeline. If frozen earth is found around old pipeline, heated air is delivered into old pipeline to defrost earth completely.
EFFECT: improved efficiency of pipe laying.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES | 1996 |
|
RU2105919C1 |
REPLACEMENT OF DEFECTIVE PIPE LINE PARTIALLY OR FULLY FILLED WITH SOIL WITHOUT DIGGING-OUT TRENCH | 1996 |
|
RU2116546C1 |
METHOD OF REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115856C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINE | 1995 |
|
RU2099624C1 |
DEVICE FOR TRENCHLESS REPLACEMENT OF PIPELINES | 2001 |
|
RU2221181C2 |
DEVICE FOR TRENCHLESS REPLACEMENT OF PIPELINES | 2001 |
|
RU2221182C2 |
METHOD FOR TRENCHLESS REPLACEMENT OF UNDERGROUND PIPELINES | 2021 |
|
RU2782480C1 |
DEVICE FOR REPLACEMENT OF UNDERGROUND PIPE LINES WITHOUT DIGGING-OUT TRENCHES | 1996 |
|
RU2115053C1 |
METHOD OF REPLACEMENT OF PIPE LINE WITHOUT DIGGING-OUT TRENCHES AND DEVICE FOR REALIZATION OF THIS METHOD | 1996 |
|
RU2116547C1 |
METHOD OF TRENCHLESS REPLACEMENT OF PIPE LINES AND DEVICE FOR REALIZATION OF THIS METHOD | 1999 |
|
RU2156909C1 |
Authors
Dates
2004-06-20—Published
2002-10-30—Filed