FIELD: gas production and transportation of gas by pipe lines under permafrost conditions.
SUBSTANCE: proposed method includes compression of gas at compressor station, control of its temperature after compression by means of air cooling equipment and delivery of gas to pipe line; during transportation of gas in cryolitic zones within period from October till December, air cooling equipment is switched off and gas heated to +15 to +30 C is fed to gas line.
EFFECT: enhanced reliability.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR OF CRYOLITE-ZONE PIPELINES WITH DUE REGARD FOR PREDICTION OF INTERACTION WITH PERMAFROST GROUNDS | 2000 |
|
RU2168099C2 |
PROCESS OF LAYING GAS PIPE-LINE IN PERMAFROST | 1987 |
|
SU1438344A1 |
0 |
|
SU1784795A1 | |
METHOD OF PIPING NATURAL GAS | 0 |
|
SU1773294A3 |
METHOD FOR REDUCTION OF ACTION OF FORCES OF FROST BOIL AND INCREASING STABILITY OF PILE FOUNDATIONS IN PERMAFROST ZONE | 2015 |
|
RU2602538C1 |
SUPPORT OF CONTACT NETWORK ERECTED ON SWELLING SOILS | 2002 |
|
RU2209269C1 |
METHOD FOR PROTECTING THE BEARING SUPPORT STRUCTURE OF ABOVE-GROUND MAIN PIPELINE FROM THE IMPACT OF THE FORCES OF FROSTY HEAVING OF SOIL | 2022 |
|
RU2785329C1 |
METHOD OF REMOTE CONTROL OF PIPELINE CONDITION IN PERMAFROST ZONE | 2004 |
|
RU2260742C1 |
METHOD OF LAYING GAS LINE IN HEAVING SOILS | 1994 |
|
RU2075682C1 |
SUPPORT OF CONTACT NETWORK ERECTED ON SWELLING SOILS | 2002 |
|
RU2209270C1 |
Authors
Dates
2004-06-27—Published
2003-07-02—Filed