FIELD: heat power engineering.
SUBSTANCE: invention relates to thermal power stations designed for ecologically clean generation of electric energy and supply of consumers. Proposed thermal power station consists of catalytic reactor on fluidized bed, turboexpansion machine with power generator, regenerative heat exchangers installed in tandem and standard or air condenser with cooling. Power-and-heat supply exchanger is connected in parallel with additional regenerative heat exchanger through bypass switch to which pipes of heat-electric power plant are laid. Bypass switch is designed to regulate take off of power to consumer. Catalytic reactor consists of hollow housing in lower part of which fluidized bed is located over distributing grid, steam generator in form of coils, steam superheater dipped partially into fluidized bed and waste gas regenerator. Housing is provided with screen vacuum insulation.
EFFECT: provision of designing fully automated ecologically clean catalytic heat-electric power plants solving problems of decentralization of heat and power supply of people.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CATALYTIC THERMAL POWER STATION AND CATALYTIC REACTOR | 2009 |
|
RU2398115C1 |
COMBINED-CYCLE STEAM POWER PLANT | 1996 |
|
RU2122642C1 |
COMBINED SOLAR-ELECTRIC POWER PLANT | 1995 |
|
RU2111422C1 |
CATALYTIC REACTOR - STEAM GENERATOR | 2011 |
|
RU2490543C2 |
METHOD AND DEVICE FOR PRELIMINARY HEATING OF RAW MATERIALS BY MEANS OF COOLER OF WASTE GASES | 2010 |
|
RU2491321C2 |
PLANT FOR BURNING GASEOUS FUEL IN CATALYTIC HOT-WATER FLUIDIZED-BED BOILER | 2004 |
|
RU2249152C1 |
METHOD OF POWER PLANT OPERATION | 2009 |
|
RU2425987C1 |
STEAM POWER PLANT AND ITS OPERATION PROCESS | 1997 |
|
RU2124641C1 |
REGENERATION STEAM-TURBINE PLANT | 2001 |
|
RU2215878C2 |
THERMAL POWER STATION WITH ORC-MODULE CIRCUIT AND WITH HEAT PUMP AND METHOD OF ITS WORK | 2015 |
|
RU2662259C2 |
Authors
Dates
2004-07-20—Published
2000-02-15—Filed