FIELD: mining; may be used in open-pit mining of mineral deposits, mainly, under conditions of permafrost rocks. SUBSTANCE: open-pit nonmining flank is formed without safety berms with inclined high reclamation benches; formed on haulage berm is protective trench on whose brow protective bank of barren rocks is filled. Placed on slopes of high benches is heat-protective shield consisting of synthetic net sheet onto which foamed plastic is sprayed. EFFECT: reduced volume of overburden operations in contour of open-pit field and increased stability of nonmining flank. 8 dwg , 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FORMATION OF NONMINING FLANK OF OPENCAST | 1993 |
|
RU2034150C1 |
METHOD FOR OPENCAST MINING OF FLAT AND SLOPING DEPOSITS OF MINERALS | 1998 |
|
RU2139429C1 |
METHOD OF BUILDING-UP OF OPENCAST NON-MINING FLANK | 2002 |
|
RU2213223C1 |
METHOD OF BUILDING-IP OF OPENCAST NONMINING FLANK | 2001 |
|
RU2209310C1 |
METHOD FOR NON-WORKING PIT WALL FORMING | 2004 |
|
RU2265126C1 |
METHOD OF OPENCAST MINING OF STEEP ELONGATED MINERAL DEPOSITS | 1999 |
|
RU2171377C2 |
METHOD FOR OPENING AND PROCESSING DEEP HORIZONS OF KIMBERLITE PIPES | 2003 |
|
RU2233982C1 |
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD FOR OPENCAST MINING OF GENTLY SLOPING AND INCLINED MINERAL DEPOSITS | 1991 |
|
RU2011827C1 |
METHOD OF BUILDING UP OF OPENCAST NONMINING FLANK | 2001 |
|
RU2206748C1 |
Authors
Dates
1997-12-20—Published
1995-04-19—Filed