FIELD: construction.
SUBSTANCE: branched pedestrian bridge includes at least three spans arranged in plan at the angles to each other and having at least one rectilinear main span, at least two spans on branches, at least one unit of their coupling, where not more than three spans meet, at least one longitudinal system of main bearing structures in each of them, at least three units of bridge ends coupling with pavement, combined with supports, including supports and devices of pedestrians lifting onto bridge. All spans are split, spans on branches are arranged as rectilinear. Angles between longitudinal axes of each pair of adjacent spans in unit of their coupling are in the range of 110°-130°.
EFFECT: invention provides for free horizontal passage over crossing obstacles between any two points of crossing.
6 cl
Title | Year | Author | Number |
---|---|---|---|
BRANCHED PEDESTRIAN BRIDGE | 2009 |
|
RU2407851C1 |
BRANCHED PEDESTRIAN BRIDGE | 2009 |
|
RU2407849C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
TRANSPORT COMPLEX OF MEGALOPOLIS AND METHOD FOR CONTROL AND RELIEF OF PASSENGER, FREIGHT - PASSENGER AND FREIGHT TRAFFICS OF MEGALOPOLIS TRANSPORT COMPLEX | 1998 |
|
RU2140480C1 |
FLOATING FERRY WITH FLOATING MODULE AND FLOATING SUPPORT WITH PYLON | 2018 |
|
RU2699198C1 |
TRANSPORTATION COMPLEX OF MEGAPOLICE AND METHOD FOR REGULATING AND RELIEVING PASSENGER, CARGO-PASSENGER AND CARGO TRAFFIC FLOWS IN IT | 1998 |
|
RU2135670C1 |
MEGAPOLICE RING HIGHWAY AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136802C1 |
DIVIDER ASSEMBLY FOR TRAFFIC AND PEDESTRIAN FLOW DIVISION AT ROAD CROSSING | 2004 |
|
RU2286417C2 |
UNIVERSAL PORTABLE BRIDGE (UARM) | 2014 |
|
RU2580957C1 |
METHOD OF RECONSTRUCTING A BRIDGE | 0 |
|
SU1434022A1 |
Authors
Dates
2010-12-27—Published
2009-06-19—Filed