FIELD: mechanical engineering; cranes. SUBSTANCE: proposed structure contains crane runway beam and columns installed on foundation. Column, being central on section of two spans of crane runway beam, is rigidly connected with the latter by 1-beam connected by web with angles rolled to radius or smooth curve and providing connection of 1-beam with lower girder of crane runway beam and said column. Crane runway beam is provided with support ribs in zone of contact with ends of 1- beam. Support ribs are made of angles rolled to smooth curve or radius. Base of column is provided with jack beam for hydraulic jack to be installed in center of column under in recess of foundation to force foundation out of soil. Jack beam is rigidly connected with column foundation by anchor bolts. EFFECT: increased service life of crane runway structure. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
PORTAL CRANE STRUCTURE | 2002 |
|
RU2235673C2 |
PROCEDURE RESTORING DESIGN POSITION OF SUNK COLUMN OF FRAME | 2000 |
|
RU2188278C2 |
CRANE-RAFTER BEAM | 2002 |
|
RU2235674C2 |
METHOD OF PROTECTION AGAINST COLLAPSE OF CRANE AND EAVES GIRDERS | 2017 |
|
RU2674736C2 |
PRESTRESSED CRANE-RUNWAY BEAM | 2004 |
|
RU2268230C2 |
DEVICE FOR PREVENTION OF BREAKING AND STRAIGHTENING AND INCREASING CARRYING CAPACITY OF CRANE RUNWAY BEAM | 2001 |
|
RU2209760C2 |
LATTICE CRANE STRUCTURE | 1997 |
|
RU2142904C1 |
FLATTENING METHOD OF H-BEAMS ATTACHED TO COLUMN | 2013 |
|
RU2562026C2 |
DOUBLE-SPAN BUILDING FRAME | 2005 |
|
RU2319817C2 |
METHOD OF STRAIGHTENING SPLIT CRANE BEAMS | 2001 |
|
RU2235675C2 |
Authors
Dates
2004-04-20—Published
2001-12-17—Filed