FIELD: mining industry, particularly ground improvement for underground structure building.
SUBSTANCE: method involves drilling bores, arranging freezing columns with liquid coolant in bores; communicating columns with reservoir filled with solid cryoagent; establishing circulation of liquid coolant and releasing gaseous cryoagent fraction. Reservoir is filled with solid cryoagent so that liquid coolant contacts directly with solid cryoagent to emit gaseous cryoagent fraction from liquid coolant.
EFFECT: reduced coolant temperature, decreased time of ground freezing out.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FREEZING SOIL | 2021 |
|
RU2781771C1 |
METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS | 2020 |
|
RU2739880C1 |
METHOD FOR FORMATION OF ICE-ROCK BARRIER | 1994 |
|
RU2078213C1 |
METHOD OF SINKING MINE SHAFT IN WEAK SOIL | 0 |
|
SU991054A1 |
PROCESS ISOLATING ZONE OF UNDERGROUND EXCAVATION FROM UNDERGROUND WATER AND METHOD OF MOUNTING OF WATER INLET EQUIPMENT IN TECHNOLOGICAL WELL | 2002 |
|
RU2211894C1 |
METHOD OF FREEZING FILTERING ROCKS | 0 |
|
SU1627706A1 |
METHOD OF ARTIFICIAL THAWING OF FROZEN ROCK | 0 |
|
SU1151677A1 |
DEEP GROUND FREEZING DEVICE | 2003 |
|
RU2263744C2 |
METHOD FOR CONSTRUCTION OF ESCALATOR TUNNEL CONSTRUCTED BY TUNNELLING IN WEAK WATERLOGGED SOILS | 2021 |
|
RU2768765C1 |
METHOD FOR ARRANGEMENT OF PIT SIDES BARRIERS IN SATURATED SOILS | 2009 |
|
RU2404327C2 |
Authors
Dates
2004-09-10—Published
2003-03-28—Filed