FIELD: mining; applicable for provision of safe and efficient mining operations under the complicated hydrogeological conditions. SUBSTANCE: method of formation of ice-rock barrier consists in that the process of formation of ice-rock barrier is controlled by stages. In this case, at all stages, the designed volume of coolant is pumped through the group of holes in the active freezing mode to form separate ice-rock bodies of optimal sizes. Transition from stage to stage is effected by changing over a group of holes of the previous stage to the passive freezing mode. Directed joining of separate ice-rock bodies into the combined ice-rock barrier is accomplished at the final stage of its formation for the preset terms. EFFECT: higher efficiency. 5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMATION OF FLAGGING SCREEN IN WATER-ENCROACHED ROCKS | 1994 |
|
RU2076923C1 |
METHOD OF FORMING ISOLATION CURTAIN AROUND MINE WORKINGS | 1994 |
|
RU2075572C1 |
METHOD OF INCREASING FORMATION OIL RECOVERY | 1994 |
|
RU2078201C1 |
METHOD FOR TUNNELLING OF VERTICAL SHAFTS IN WATERED UNSTABLE ROCKS AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2398967C1 |
METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS | 2020 |
|
RU2739880C1 |
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS | 1990 |
|
RU2095574C1 |
METHOD FOR CONSTRUCTION OF ESCALATOR TUNNEL CONSTRUCTED BY TUNNELLING IN WEAK WATERLOGGED SOILS | 2021 |
|
RU2768765C1 |
Authors
Dates
1997-04-27—Published
1994-11-22—Filed