FIELD: underground construction, construction and reconstruction of technological wells in process of sinking operations. SUBSTANCE: proposed process isolating zone of conducting operations-zone of underground excavation from underground water in area of technological well includes formation of sealing ice coffer-dam and ice-and-soil guard with the aid of nitrogen freezing beneath level of base of underground excavation. Process of nitrogen freezing includes stage of gradual cooling of frozen zone with gaseous nitrogen and subsequent stage of freezing with liquid nitrogen. Method of mounting and replacement of equipment of technological well is realized under protection of ice coffer-dam and ice- and-soil guard formed by process described above. Technical result of invention consist in development of safe and economical process of isolation of zone of underground excavation from underground water in area of technological well as well as development of safe and economical technology of conducting operations for construction and reconstruction of technological wells under protection of ice-and-soil coffer-dam formed by process described above. EFFECT: development of safe and economical process of isolation of zone of underground excavation from underground water. 21 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR ZONAL FREEZING OF GROUND BY NITROGEN | 1998 |
|
RU2149240C1 |
METHOD OF CONSTRUCTION OF UNDERGROUND WORKINGS IN UNSTABLE WATER-SATURATED GROUNDS | 1995 |
|
RU2111361C1 |
SEALING MIXTURE FOR WATERPROOFING AND CONCRETING TUNNEL LININGS | 2008 |
|
RU2385303C2 |
METHOD OF TWO-LANE TUNNEL CONSTRUCTION | 2016 |
|
RU2625064C1 |
TUNNEL LINING | 2001 |
|
RU2202681C2 |
METHOD FOR FREEZING SOIL | 2021 |
|
RU2781771C1 |
METHOD FOR DRIVING TUNNELS IN UNSTABLE WATER-SATURATED ROCKS | 1992 |
|
RU2043501C1 |
PROCESS OF ROCK FREEZING DURING CONSTRUCTION OF UNDERGROUND STRUCTURES AND GEAR FOR ITS IMPLEMENTATION | 1996 |
|
RU2109951C1 |
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS | 1990 |
|
RU2095574C1 |
METHOD OF UNDERGROUND RESERVOIRE CREATION IN FROZEN SOLIDS | 2006 |
|
RU2327624C1 |
Authors
Dates
2003-09-10—Published
2002-07-05—Filed