METHOD FOR CONSTRUCTION OF ESCALATOR TUNNEL CONSTRUCTED BY TUNNELLING IN WEAK WATERLOGGED SOILS Russian patent published in 2022 - IPC E21D9/00 

Abstract RU 2768765 C1

FIELD: construction.

SUBSTANCE: invention relates to the field of construction of tunnels, in particular to construction of subway escalator tunnels, which are erected by a tunnelling with a closed monolithic reinforced concrete lining of a circular outline. Construction of temporary support is carried out after tunnelling from top to bottom along the escalator tunnel, the temporary support is provided from metal arches with draft concrete, in the transverse direction the temporary support is erected from the arch to the chute part of the tunnel section. After construction of the temporary support under its protection, concreting of the permanent lining of the escalator tunnel is performed, from the bottom upwards along the escalator tunnel, before laying the concrete of the permanent lining of the tunnel. Preparation of surface of rough concrete of temporary lining is performed for application of waterproofing layer; after application of waterproofing layer reinforcement is installed and concrete of permanent lining of tunnel is laid. Work on the construction of the permanent lining in the longitudinal section is carried out from the bottom up along the escalator tunnel, and in the cross section of the tunnel they are carried out from the chute part to the arch of the tunnel, in the lower part of the tunnel simultaneously with the construction of the permanent lining, monolithic reinforced concrete supports are concreted, on which after construction of escalator tunnel lining monolithic reinforced concrete slabs are concreted for installation of stair blocks in process passages and structures of escalators. At the same time erection works on construction of stair blocks and structures of escalators are carried out from bottom to top along the escalator tunnel after completion of construction works.

EFFECT: increase of speed and manufacturability of construction, provision of necessary rational contour of lining, as well as increase of safety of construction and reliability of operation of escalator tunnel.

1 cl, 1 dwg

Similar patents RU2768765C1

Title Year Author Number
METHOD FOR CONSTRUCTION OF ESCALATOR CASCADE COMPLEX FOR THE ENTRANCE TO THE METRO STATION, CONSTRUCTED USING CUT-AND-COVER METHOD 2021
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Fadeeva Vera Borisovna
RU2766876C1
METHOD FOR CONSTRUCTING A THREE-SPAN SUBWAY STATION OF AN OPEN METHOD OF PERFORMING WORKS WITH A LATERAL ARRANGEMENT OF PASSENGER PLATFORMS AND A DOUBLE-TRACK STILL TUNNEL 2018
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Donenko Ekaterina Evgenevna
RU2692518C1
METHOD OF CONSTRUCTING DEEP UNDERGROUND STATION ON OPERATING UNDERGROUND LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
RU2825811C1
SINGLE-VAULT DEEP UNDERGROUND STATION WITH SUPPORTING TUNNELS, CONSTRUCTED BY A CLOSED METHOD FOR WORK 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
RU2785300C1
METHOD FOR ERECTING A THREE-SPAN METRO STATION WITH A DOUBLE-TRACK MIDDLE STATION TUNNEL AND SIDE STATION HALLS WITH PASSENGER PLATFORMS 2022
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
  • Donenko Ekaterina Evgenevna
RU2779168C1
METHOD FOR CONSTRUCTING A SINGLE-VAULT DEEP-LEVEL METRO STATION 2021
  • Konkov Aleksandr Nikolaevich
  • Novikov Anatolij Leonidovich
  • Sokornov Anton Aleksandrovich
RU2764510C1
METHOD FOR CONSTRUCTING METRO STATION FROM PREFABRICATED ELEMENTS USING CLOSED METHOD OF PERFORMING WORK ON EXISTING METRO LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
RU2815900C1
METHOD FOR ERECTION OF THREE-VANE SUBWAY STATION OF CLOSED METHOD OF PERFOMING WORKS WITH DOUBLE-TRACK MAIN LINE TUNNEL 2019
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
  • Tyushevskaya Lidiya Valentinovna
RU2704414C1
METHOD OF CONSTRUCTING SUBWAY PYLON STATION USING CLOSED METHOD OF PERFORMING WORKS ON OPERATING SUBWAY LINE WITHOUT INTERRUPTING TRAIN TRAFFIC 2023
  • Zakharov Georgij Rafaelevich
  • Maslak Vladimir Aleksandrovich
  • Ryabkov Stanislav Valerevich
RU2824544C1
METHOD OF CONSTRUCTING PASSAGES IN DEEP LEVEL UNDERGROUND RAILWAY PYLON STATIONS 2018
  • Konkov Aleksandr Nikolaevich
  • Samokutyaev Dmitrij Petrovich
  • Sokornov Anton Aleksandrovich
RU2691420C1

RU 2 768 765 C1

Authors

Zakharov Georgij Rafaelevich

Maslak Vladimir Aleksandrovich

Ryabkov Stanislav Valerevich

Tyushevskaya Lidiya Valentinovna

Fadeeva Vera Borisovna

Dates

2022-03-24Published

2021-05-04Filed