FIELD: mining industry.
SUBSTANCE: device has engaged ceiling, border, back cross-beam, each assembly of which has extending sides located oppositely on both sides of support, which sides are controlled by one or several hydraulic jacks placed in pairs and coaxially, and fixed in central portion of metallic construction. Each hydraulic jack is provided with adjusting insert placed in the guide on the side of extending side. Heads of rods of hydraulic jacks are connected to central portion of metallic construction and are provided with sockets for feeding of working liquid to hydraulic jack. Hydraulic jacks rods heads may be connected to central portion of metallic construction by a common finger or each with its own finger. Guide, adjusting insert and extending side ,ay be connected by common finger.
EFFECT: higher reliability of operation and higher safety.
8 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ROOFING OF POWERED SUPPORT UNIT | 2000 |
|
RU2178083C1 |
POWERED SUPPORT, SUPPORT CONTROL SYSTEM, INTERUNIT SUPPORT LAGGING, SUPPORT HYDRAULIC SYSTEM | 1999 |
|
RU2181842C2 |
COMBINED-EXCAVATION POWERED STOPING SET | 0 |
|
SU798315A1 |
METHOD FOR PREPARATORY MINE WORKING AND MECHANIZED SUPPORT FOR ITS IMPLEMENTATION | 2019 |
|
RU2724816C1 |
POWERED ROOF SUPPORT TERMINAL GROUP | 0 |
|
SU1816866A1 |
METHOD FOR PREPARATORY MINE WORKING AND MECHANIZED SUPPORT FOR IMPLEMENTATION THEREOF | 2020 |
|
RU2739010C1 |
BEAM OF POWER SUPPORT UNIT | 0 |
|
SU1320437A1 |
DEVICE FOR CONNECTION OF COVERING WITH ENCLOSURE OF POWERED SUPPORT SECTION | 2011 |
|
RU2471072C2 |
POWER SUPPORT UNIT | 0 |
|
SU1315618A1 |
POWER ROOF SUPPORT | 0 |
|
SU1023102A1 |
Authors
Dates
2004-09-10—Published
2003-05-26—Filed