FIELD: building, particularly pile foundation and foundation posts building in permafrost grounds.
SUBSTANCE: method involves introducing open-type steam heater; performing ground defrosting; injecting stabilizing solution into ground. Defrosting is carried out in area of V volume divided into active sub-area of Va volume and reactive sub-area of Vr volume. Defrosting process is divided into partly defrosted stage of duration, and settling stage of duration. Active and reactive areas are composed of several parts of d thickness alternating along defrosting area height or width. Above parameters are determined from given equations.
EFFECT: reduced time of necessary ground temperature reaching before stabilizing solution injection, reduced total volume of defrosted ground.
8 dwg
Title | Year | Author | Number |
---|---|---|---|
ARCH-TYPE FILLED BRIDGE | 2003 |
|
RU2236498C1 |
METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST | 2009 |
|
RU2455419C2 |
METHOD FOR ERECTING EMBANKMENT FROM SUBSTANDARD SOILS ON PERMAFROST | 2016 |
|
RU2647517C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
METHOD OF DETERMINING TEMPERATURE PERMAFROST ROCK MASS AROUND WELL AND IN-WELL FLUID TEMPERATURE | 2014 |
|
RU2588076C2 |
METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST | 2009 |
|
RU2455418C2 |
METHOD TO REINFORCE SOILS IN BUILDING FOUNDATIONS AND EARTH BED OF LINEAR STRUCTURES ON PERMAFROST SOILS | 2013 |
|
RU2537437C1 |
ROAD EMBANKMENT WITH DRAINAGE GROOVE | 2003 |
|
RU2245965C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256032C1 |
METHOD FOR ERECTION OF BRIDGE SUPPORT PILLAR ON PERMAFROST | 2009 |
|
RU2392370C1 |
Authors
Dates
2004-09-20—Published
2003-02-25—Filed