FIELD: oil extractive industry.
SUBSTANCE: method includes control of water level in well product and adjustment of liquid draining values relatively to value of water level. Water level control for product of well is performed by means of constant concurrent measurement of current values of product water level coming in from each productive bed. During control process bed are fixed with water level not matching maximally allowed values for each bed, determined from condition of minimizing of specific costs of watered product extracted from each said bed. Value of extraction from said beds is changed by choking flows up to exclusion of unbalance of current values of water level with allowed value. Product water level control is best performed by means of measuring its electrical conductivity for alternating current.
EFFECT: optimal mode of operation for wells due to selective choking of product flow from each bed performed on basis of differential criteria of their water level.
2 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF WELL OF MULTIFORMATION OIL FIELD | 1996 |
|
RU2100580C1 |
METHOD OF WELL OPERATION AT STACK OIL DEPOSIT | 2007 |
|
RU2334084C1 |
METHOD FOR DEVELOPING WATER-FLOODED RESERVOIR-TYPE OIL DEPOSIT | 2023 |
|
RU2805435C1 |
PROCEDURE FOR DEVELOPMENT OF OIL MASSIVE POOL | 2011 |
|
RU2427708C1 |
OIL DEPOSIT EXTRACTION METHOD | 2003 |
|
RU2247230C1 |
DEVELOPMENT METHOD OF OIL MASSIVE DEPOSIT AND ADJUSTABLE WELL VALVE | 2010 |
|
RU2443854C1 |
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT | 2010 |
|
RU2421606C1 |
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT | 2010 |
|
RU2431737C1 |
DEVELOPMENT METHOD FOR STACKED OIL POOL HAVING WATER-OIL ZONES AND/OR MASSIVE POOL | 2004 |
|
RU2282022C2 |
METHOD OF OIL POOL DEVELOPMENT AT LATE STAGE | 2000 |
|
RU2178517C2 |
Authors
Dates
2004-09-27—Published
2002-10-23—Filed