FIELD: oil extractive industry.
SUBSTANCE: method includes consecutive feeding into influx area of polymer compound and cement suspension, polymer compound has hardening time 90-120 minutes, feeding of cement suspension is performed after pumping of separator liquid having concurrently properties of hardening agent for polymer compound and accelerating agent for hardening of cement suspension, and before and after separating liquid additionally pumped are intermediate bodies of fresh water.
EFFECT: higher effectiveness of isolation of water influx areas by means of increasing stability of isolating border.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
WELL REPAIR METHOD | 2011 |
|
RU2483193C1 |
WELLS HIGH INTENSITY ABSORPTION INTERVALS INSULATION METHOD AND AERATED SLURRY FOR ITS EXECUTION | 2008 |
|
RU2379474C2 |
ISOLATION METHOD OF WATER INFLUX TO WELL | 2010 |
|
RU2425957C1 |
METHOD OF INSULATION AND RESTRICTION OF WATER PRODUCTION IN WELLS | 2008 |
|
RU2370630C1 |
PLASTIC COMPOSITION FOR ISOLATION AND LIMITATION OF WATER INFLOW INTO WELLS | 2020 |
|
RU2761037C1 |
METHOD OF REINFORCING BOTTOMHOLE FORMATION AND ISOLATION OF BRINE WATER INFLUX IN OIL AND GAS WELLS | 2014 |
|
RU2587670C2 |
METHOD OF SHUT-OFF AND RESTRAINT OF WATER PRODUCTION IN WELLS | 2007 |
|
RU2349731C2 |
PROCEDURE FOR INCREASE OF PRODUCING ABILITY OF WELLS (VERSIONS) | 2013 |
|
RU2542000C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2018 |
|
RU2684932C1 |
Authors
Dates
2004-10-10—Published
2003-01-20—Filed