FIELD: mining industry.
SUBSTANCE: method includes controlled displacement of dump due to use of natural displacement of dump along slanting flexible layer, formed at the first place before placement of rock solids in a dump by layer of rock solids of cold period of dump forming including snow and on this layer rock solids of warm season are placed, or oppositely, first, a layer of warm season rock solids and on it rock solids of cold season are placed (contact zone - zero degrees), then, onto slanting flexible layer opening rock solids are placed first at narrow front, then at broad front when dump limits approach quarry limits, to provide for in case of warm interaction of rock solids in slanting layer a creation of maximum displacing forces and displacing the dump onto gently sloping portion of slope with lower need of rock solids reexcavation. In case of restarting dump forming with use of slanting flexible layer a gradual filling of slope with opening rock solids is achieved.
EFFECT: higher adaptability to use of process for controlling movement of dump on a slope.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ROCKS STORING INTO DUMP ON SLOPES IN STAGE MINING OF HIGHLAND DEPOSITS | 2001 |
|
RU2194859C2 |
METHOD OF OPEN MINING OF MINERAL DEPOSITS WITH FORMING OF DUMP WITH LARGE VOLUME AND HEIGHT IN DIFFICULT CONDITIONS | 2011 |
|
RU2543765C2 |
PILLING OF DIFFERENT-HARDNESS ROCKS IN HIGH-CAPACITY GREAT-HEIGHT DUMP WITH APPLICATION OF MOBILE DISCHARGE BOOM | 2013 |
|
RU2571111C2 |
METHOD FOR HIGH LAYERED DUMP FORMING | 2006 |
|
RU2310077C1 |
METHOD FOR INTERNAL REFUSE DISPOSAL | 0 |
|
SU1788262A1 |
METHOD FOR FORMING DUMPS ON SLOPES | 2003 |
|
RU2237166C1 |
METHOD OF DUMP FORMATION | 0 |
|
SU1033739A1 |
METHOD OF CONTROLLING ROCK DUMPING | 0 |
|
SU848641A1 |
METHOD OF DUMPING OVERBURDEN ROCK UNDER FLOODING CONDITIONS | 0 |
|
SU1113546A1 |
DUMPING METHOD DURING DEVELOPMENT OF UPLAND QUARRIES | 2017 |
|
RU2658420C1 |
Authors
Dates
2004-10-10—Published
2003-03-07—Filed