FIELD: building, particularly for laying pipelines.
SUBSTANCE: method for laying flexible pipelines of water-supply, sewage or horizontal closed drainage systems involves excavating trench; laying above pipeline and back filling trench with ground. Trench is excavated simultaneously with providing longitudinal groove in one vertical trench wall at bottom level thereof in which said pipeline is located.
EFFECT: prevention of flexible pipeline deformation during its laying on trench bottom.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INSTALLATION OF PIPELINE COMPLEX | 2006 |
|
RU2378458C2 |
METHOD TO BUILD COMPLEX OF PIPELINES | 2011 |
|
RU2489631C2 |
METHOD FOR CLOSED DRAINAGE CONSTRUCTION AND DEVICE FOR ITS ACCOMPLISHMENT | 0 |
|
SU1714054A1 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) | 2004 |
|
RU2249144C1 |
METHOD FOR LAYING DEEP-SEATED HORIZONTAL DRAINAGE SYSTEMS | 1990 |
|
RU2018578C1 |
NARROW-TRENCH METHOD OF HORIZONTAL DRAIN CONSTRUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2422586C1 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
METHOD LAYING UNDERGROUND PIPE LINE | 1995 |
|
RU2090795C1 |
METHOD FOR CONSTRUCTION OF DRAINAGE SYSTEM IN WATER-LOGGED SOILS | 1992 |
|
RU2017893C1 |
PROCEDURE FOR LAYING FLEXIBLE PIPELINES | 2010 |
|
RU2425195C1 |
Authors
Dates
2004-10-20—Published
2001-12-27—Filed