FIELD: construction.
SUBSTANCE: method for installation of pipeline complex for water-, gas- and heat supply, sewage, telecommunication and electrical cables and closed horizontal drain includes digging the main trench by means of earth-moving machine with simultaneous formation of longitudinal niches in one or both side walls of the main trench, transverse axes of which are inclined relative to plane of side walls of the main trench. Further each of pipelines is installed into its personal longitudinal niche, rigidly fixed and backfilled from earth deposit.
EFFECT: increased efficiency, simplicity and safety of method.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO BUILD COMPLEX OF PIPELINES | 2011 |
|
RU2489631C2 |
METHOD FOR LAYING FLEXIBLE PIPELINES | 2001 |
|
RU2238373C2 |
METHOD OF LAYING OF POLYETHYLENE DRAINAGE AND DEVICE FOR ITS EMBODIMENT | 1999 |
|
RU2170792C2 |
NARROW-TRENCH METHOD OF HORIZONTAL DRAIN CONSTRUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2422586C1 |
ADAPTIVE SUBSOILER FOR COMPACTED FLAT AND SLOPING SOILS | 2022 |
|
RU2799608C1 |
METHOD AND DEVICE FOR DRAINING MANIFOLD LAYING IN WATER-SATURATED GROUND | 2005 |
|
RU2320814C2 |
METHOD OF DRAINAGE CONSTRUCTION IN POORLY DRAINING SOILS | 0 |
|
SU1794130A3 |
METHOD FOR LAYING DEEP-SEATED HORIZONTAL DRAINAGE SYSTEMS | 1990 |
|
RU2018578C1 |
METHOD FOR PIPE DRAINAGE SYSTEM CONSTRUCTION IN WATER-SATURATED GROUND AND DRAINAGE LAYING MACHINE FOR ABOVE METHOD REALIZATION | 2005 |
|
RU2279507C1 |
METHOD FOR DRAINAGE INSTALLATION AND DEVICE FOR ITS REALISATION | 2011 |
|
RU2469149C1 |
Authors
Dates
2010-01-10—Published
2006-07-25—Filed