FIELD: construction.
SUBSTANCE: pressure in the pipeline is lowered down to 6 MPa. The damaged part of the pipe line is provided with round temporary openings with thread, and liquid carbon anhydride is supplied into the pipeline. During phase transition, dry ice is generated and plugs the cross-section of the pipeline thus sealing the damaged part. After the end of repairing, the dry ice is sublimated thus removing obstacle for flowing the fluid through the repaired pipeline.
EFFECT: simplified method of repairing.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ELIMINATION OF ACCIDENTS IN OIL PRODUCTS PIPE LINE | 2001 |
|
RU2204078C2 |
DEVICE FOR SHUTTING DOWN PIPELINE FILLED WITH OIL | 2004 |
|
RU2271496C2 |
METHOD FOR PERFORMING FIRE FIGHTING EMERGENCY AND REPAIR OPERATIONS ON PETROLEUM PRODUCT PIPELINES | 0 |
|
SU1743614A1 |
APPARATUS FOR CHANGING PIPELINE SECTION | 0 |
|
SU892109A1 |
METHOD OF REPLACING DEFECTIVE SECTION OF MAIN LINE | 2002 |
|
RU2249142C2 |
DEVICE FOR TIGHT CLOSURE OF INTERNAL CAVITY OF OIL PRODUCT PIPELINE OR OIL PIPELINE | 2018 |
|
RU2730132C2 |
COMPOSITION FOR TEMPORARY SEALING DEVICE USED FOR HOT WORKS ON SMALL-DIAMETER GAS PIPE | 2016 |
|
RU2641820C2 |
PREPARATION METHOD OF OIL-TRUNK PIPELINE FOR TRANSPORTATION OF LIGHT PETROLEUM PRODUCTS | 2015 |
|
RU2609786C1 |
DEVICE FOR CLOSING PIPELINE FILLED WITH OIL PRODUCT | 2004 |
|
RU2269714C2 |
SYSTEM OF CONSTANT MONITORING OF CONCENTRATION OF HYDROCARBON VAPORS OF OIL AND PETROLEUM PRODUCTS IN THE AIR OF WORKING AREA DURING FIRE AND GAS HAZARDOUS OPERATIONS | 2017 |
|
RU2663565C1 |
Authors
Dates
2004-11-27—Published
2002-12-17—Filed