FIELD: railway transport: permanent way.
SUBSTANCE: proposed ballasting machine contains frame made for movement by running mechanisms and connected with cross belt conveyor with direction of transportation square to longitudinal direction of machine, and carrier for carrying and damping of ballast provided with unloading end. Cross belt conveyor is made for re-placing relative to unloading end of carrier in direction of transportation by means of cross shift drive. Re-placing device is provided to shift unloading end and cross belt conveyor relative to each other in longitudinal direction of machine with possibility of choosing of position in which ballast is dumped both directly on rail track and through cross belt conveyor on outer slope of ballast section.
EFFECT: improved ballasting of rail track.
8 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL TRACK RECONSTRUCTION MACHINE | 2001 |
|
RU2225472C2 |
TRACK-LAYING MACHINE FOR REMOVING BALLAST MATERIAL | 1997 |
|
RU2119001C1 |
BALLAST SPREADING MACHINE AND METHOD OF TRACK BALLASTING | 1998 |
|
RU2150545C1 |
SLEEPER-TAMPING MACHINE | 0 |
|
SU1558304A3 |
CRUSHED STONE BALLAST BED DISTRIBUTION AND LEVELLING MACHINE | 0 |
|
SU1817795A3 |
MACHINE FOR COMPACTION AND PROFILING OF CRUSHED ROCK BALLAST BED LAYER OF RAILWAY TRACK | 1998 |
|
RU2131955C1 |
FREIGHT CAR FOR BULK MATERIAL | 1998 |
|
RU2137696C1 |
RAIL MACHINE FOR DISTRIBUTION AND PROFILING OF CRUSHED-STONE BALLAST LAYER | 0 |
|
SU1808038A3 |
METHOD FOR SPREADING AND PLANING THE RUBBLE BALLAST OF RAILWAY TRACK | 1991 |
|
RU2048628C1 |
BALLASTING MACHINE | 1996 |
|
RU2112101C1 |
Authors
Dates
2005-02-20—Published
2002-11-05—Filed