FIELD: railway transport; repair of permanent way. SUBSTANCE: machine has frame resting on running bogies, suction device with suction hose with hole for sucking crushed stone, belt conveyor for transportation of sucked in crushed stone and set for lifting rail track, all installed on frame. Device with intake funnel designed for putting out crushed stone is arranged after the suction hose in direction of machine straight ahead movement. Machine has transportation device arranged along the machine which is furnished with intake end designed for suction device and putting out end designed for funnel of crushed stone putting out device. Rail track lifting device is located between suction hole and crushed stone putting out device. EFFECT: enlarged operating capabilities. 6 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TREATMENT OF CRUSHED STONE OF RAIL TRACK | 1994 |
|
RU2087611C1 |
METHOD AND DEVICE FOR REPAIR OF LOWER COURSE OF RAILWAY TRACK BALLAST PRISM | 1995 |
|
RU2102550C1 |
METHOD FOR SPREADING AND PLANING THE RUBBLE BALLAST OF RAILWAY TRACK | 1991 |
|
RU2048628C1 |
CRUSHED-STONE SPREADING MACHINE | 1994 |
|
RU2087612C1 |
METHOD OF AND DEVICE FOR RECONDITIONING OF RAILWAY TRACK BALLAST LAYER | 1994 |
|
RU2086723C1 |
TRACK-LAYING MACHINE FOR REMOVING BALLAST MATERIAL | 1997 |
|
RU2119001C1 |
DEVICE FOR CONTINUOUS CLEANING CRUSHED STONES AT RAILWAY | 1993 |
|
RU2053326C1 |
MACHINE FOR REMOVING LOOSE MATERIAL FROM RAILWAY TRACK | 1997 |
|
RU2118419C1 |
MACHINE FOR TAKING OUT CRUSHED STONE FROM RAILWAY TRACK BALLAST LAYER | 1994 |
|
RU2087610C1 |
RAILWAY TRACK BALLAST CLEANER | 1992 |
|
RU2022074C1 |
Authors
Dates
1998-05-27—Published
1996-08-29—Filed