FIELD: fire-fighting equipment, particularly for peat fire spread prevention.
SUBSTANCE: method involves forming intermittent strips; supplying water to intermittent strips and forming wetted area. Wetted area is formed by arranging mole drains along intermittent strip lengths and supplying water to them to moisture peat bed through the whole thickness thereof. To perform preventive water conservation intermittent strip surfaces located above mole drains are loosened for 0.15 - 0.2 m depth and 1.0 - 1.5 m width and intermittent strip surfaces above mole drains in fire vicinity are rolled up. Fire inhibitors are added to water before supplying thereof in mole drains.
EFFECT: increased fire-protective efficiency regardless of peat bed thickness.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXTINGUISHING PEAT FIRES | 2013 |
|
RU2546434C2 |
METHOD OF PREVENTING FIRE SPREADING ON PEATBOGS | 2010 |
|
RU2432977C1 |
METHOD OF EXTINGUISHING LOCAL SURFACE AND UNDERGROUND PEAT FIRES AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2016 |
|
RU2639074C1 |
METHOD TO PREVENT FLAME PROPAGATION ON PEAT | 2011 |
|
RU2457876C1 |
METHOD OF PEAT FIRE SPREADING PREVENTION | 2003 |
|
RU2236877C1 |
METHOD OF LOCAL FIRE SUPPRESSION OF PEAT FIRES AND QUICK-SETTING FOAM FOR LOCALIZATION OF PEAT FIRE COMBUSTION SOURCES | 2016 |
|
RU2645542C2 |
METHOD OF EXTINGUISHING LOCAL UNDERGROUND PEAT BURNING FIRES | 2018 |
|
RU2701593C1 |
METHOD OF FIRE FIGHTING AND PREVENTION OF IGNITION PEATLANDS AND LANDFILLS | 2011 |
|
RU2446847C1 |
METHOD TO PREVENT, LOCALISE AND EXTINGUISH FIRE AT PEATBOGS | 2010 |
|
RU2438738C1 |
PEAT-BED FIRE PREVENTION METHOD | 2004 |
|
RU2254154C1 |
Authors
Dates
2005-03-10—Published
2003-04-16—Filed