FIELD: construction engineering; erection and operation of pipe lines.
SUBSTANCE: proposed method includes detection of drying water course intersected by pipe lines and determination of its direction and boundaries within pipe line route. Trench is dug over entire width of drying water course; depth of this trench exceeds depth of lower generatrix of pipe line. Wall of trench on side of pipe line and its bottom are covered with watertight coat; water-permeable coats are laid on opposite wall and on end walls. Water receiver and water conduit are made on section of trench where its height is minimum; water conduit is laid under pipe line. According to another version, trench is dug over entire width of surface drying water course before and in parallel with pipe line; depth of trench exceeds depth of lower generatrix of pipe line; then, watertight shield is laid on trench wall on side of pipe line; height of this shield exceeds depth of trench by at least 0.3 m; water receiver and water conduit connected with it are made in section of trench at minimum height; water conduit is laid under pipe line; trench is filled with water-permeable material beyond water receiver.
EFFECT: enhanced reliability of pipe line.
8 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREVENTING STRESS CORROSION CRACKING IN UNDERGROUND PIPELINES | 2017 |
|
RU2638121C1 |
METHOD OF PIPELINE REPAIR (VERSIONS) | 2004 |
|
RU2332610C2 |
METHOD OF DETECTION OF SECTIONS OF MAIN-TYPE PIPE LINE LIABLE TO CORROSION CRACKING UNDER STRESS | 2003 |
|
RU2247893C2 |
RIVERBED-DIVERSION STRUCTURE OF SEASONAL WATERWAY ON PERMAFROST | 2008 |
|
RU2382139C1 |
METHOD OF PREVENTION OF CORROSION CRACKING UNDER STRESS OF PIPE LINES | 1997 |
|
RU2120079C1 |
CULVERT UNDER EMBANKMENT IN PERMAFROST SOILS AT PERIODICALLY OPERATING WATERWAY | 2008 |
|
RU2370590C1 |
METHOD OF REJECTION AND REPAIR OF UNDERGROUND PIPE LINES | 2016 |
|
RU2639599C2 |
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
CULVERT UNDER THE EMBANKMENT | 2017 |
|
RU2660699C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
Authors
Dates
2005-03-10—Published
2003-04-17—Filed