FIELD: bridge building, particularly structural or constructional details of bridges.
SUBSTANCE: method involves forming channels in pier and in span structure to be mounted, wherein channel axes face each other; registering channel axes; arranging high-strength reinforcement in channels of span structure and pier so that anchor connections may be installed at least on one reinforcement end and/or demounted from it; connecting another reinforcement end to reinforcement tightening means; tensioning temporary reinforcement and compensating force caused due to span structure cantilevered position on pier; performing span structure securing to pier and connecting longitudinal reinforcement thereof; removing stresses from temporary prestressed bundles; demounting anchor connections and removing temporary stressed reinforcement bundles from channels.
EFFECT: increased building rate, increased connection reliability, reduced labor inputs, possibility to use reinforcement bundles in main bridge structure parts.
11 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
MONOLITHIC SOLID PRESTRESSED PLATE-AND-RIB BRIDGE SPAN STRUCTURE | 2004 |
|
RU2249068C1 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
BUNDLED BARS MADE OF HIGH STRENGTH ROPES AND METHOD FOR MANUFACTURING PRE-STRESSED REINFORCED CONCRETE STRUCTURES USING BUNDLED BARS | 2001 |
|
RU2178045C1 |
METHOD FOR REINFORCEMENT OF PRESTRESSED UNITS IN SPAN STRUCTURES | 1997 |
|
RU2094579C1 |
PRESTRESSED FERROCONCRETE CONSTRUCTIONS | 1997 |
|
RU2131010C1 |
METHOD FOR ERECTION OF MONOLITHIC MULTI-SPAN OVERLAPPING | 2019 |
|
RU2710229C1 |
METHOD TO ERECT BASE PIER SECTION OF CABLE TRUSS BRIDGE SPAN CABLE-STAYED GIRDER AND PILOT BEAM TO REALISE THIS METHOD | 2011 |
|
RU2460838C1 |
METHOD FOR MANUFACTURING A GRAVITY-TYPE BASE (GTB) AT A SPECIALIZED PRODUCTION SITE | 2022 |
|
RU2771197C1 |
Authors
Dates
2005-03-27—Published
2004-02-16—Filed