FIELD: mining. SUBSTANCE: effective rock resistivity is measured by electric profiling at working surface after working face motion in unfastened space. Coefficient of crack permeability of rock, and decrease of design load on timbering are determined on the base of the value measured. According to decreased load design parameters are measured by a method as follows: increasing distance between timbering frames, decreasing mean distance between framework and working surface, decreasing strength of mortar. Then frame-like metal timbering, framework with injection pipes are installed. Injection plant is connected to the pipes and cement-sand solution is injected to the space between the framework and working contour. Water-cement solution penetrates to rock cracks to form cementation zone that forms additional bearing shell. EFFECT: steel-concrete timbering. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ROCKS GROUTING WITH NONUNIFORM JOINTING | 2000 |
|
RU2183273C2 |
METHOD FOR STRENGTHENING OF ROCK MATTER | 1996 |
|
RU2112881C1 |
METHOD FOR SUPPORTING JUNCTIONS OF UNDERGROUND WORKINGS | 1996 |
|
RU2116454C1 |
METHOD OF MINE WORKING BOLTING | 1999 |
|
RU2160837C2 |
METHOD FOR SUPPORTING MINING WORKINGS WITH LOOSE ROOF ROCK BY ANCHOR SUPPORT | 1997 |
|
RU2128773C1 |
METHOD OF SAFEGUARD OF MINE WORKINGS IN BEDS | 1997 |
|
RU2122116C1 |
METHOD OF SUPPORTING MINE WORKINGS IN ADJACENT COAL SEAMS | 1999 |
|
RU2167301C1 |
MODEL OF FISSURED ROCK MASS EXPOSED BY BORE-HOLE | 1997 |
|
RU2134346C1 |
FORM FOR CONSTRUCTING SUPPORTS OF MINE WORKINGS | 0 |
|
SU1283404A1 |
MINE LINING METHOD | 2004 |
|
RU2283959C2 |
Authors
Dates
1996-08-10—Published
1994-03-14—Filed