METHOD FOR EXTRACTION OF LIFTING PIPES COLUMN FROM A WELL Russian patent published in 2005 - IPC

Abstract RU 2250978 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes collapsing upper portion of fountain armature, mounting suspended branch pipe with sleeve for being held by elevator, mounting elevator below sleeve of upper lifting pipe, unloading lifting pipe column onto elevator, turning off lifting pipes. After collapsing upper portion of fountain armature pipe catcher is lowered inside lifting pipes column on drilling pipe and then is connected inside lifting pipes column. Pipe catcher with lifting pipes column on it is then raised for value, enough to screw off holder of lifting column. Holder of lifting pipes is detached and column is unloaded onto packer. Pipe catcher is detached and extracted from well on drilling pipe. Lifting pipes holder is extracted from crosspiece of fountain armature. Suspension branch pipe with sleeve for being held by elevator is lowered into well, and screwed on uppermost lifting pipe. Lifting pipes column is pulled upwards with concurrent rightward rotation and then lifting pipes column is disconnected from packer. After that lifting pipes column is raised from the well.

EFFECT: higher efficiency.

3 dwg

Similar patents RU2250978C1

Title Year Author Number
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE 2013
  • Krasovskij Aleksandr Viktorovich
  • Nemkov Aleksej Vladimirovich
  • Kustyshev Aleksandr Vasil'Evich
  • Kustyshev Denis Aleksandrovich
  • Panikarovskij Evgenij Valentinovich
  • Antonov Maksim Dmitrievich
RU2539060C1
PROCESS OF RESTORATION OF WELLS UNFIT FOR FURTHER USE 1999
  • Illjuk N.I.
  • Chabaev L.U.
  • Kovalenko S.A.
RU2176724C2
METHOD OF TRANSFER OF GAS AND GAS CONDENSATE WELLS, INCLUDING FLOODED ONES, FOR OPERATION ALONG TWO LIFTING COLUMNS, METHOD OF SUCH WELLS OPERATION AND DEVICE FOR IMPLEMENTATION OF SUCH METHODS 2019
  • Dikamov Dmitrij Vladimirovich
  • Donchenko Mikhail Aleksandrovich
  • Maltsev Pavel Nikolaevich
RU2739273C2
METHOD FOR HYDRAULIC RESERVOIR FRACTURING INSIDE GAS WELL 2005
  • Kustyshev Aleksandr Vasil'Evich
  • Obidnov Viktor Borisovich
  • Zozulja Grigorij Pavlovich
  • Krjakvin Dmitrij Aleksandrovich
  • Afanas'Ev Akhnaf Vasil'Evich
  • Kochetov Gennadij Sergeevich
  • Tokarev Aleksandr Pavlovich
  • Lakhno Elena Jur'Evna
RU2306412C1
METHOD OF WARMING-UP OF HYDRATE-PARAFFIN PLUGS IN OIL AND GAS WELLS 2002
  • Nosyrev A.M.
  • Soldatov E.P.
  • Bagrov A.I.
RU2212522C1
METHOD OF SUSPENDING STEEL POLYMER FLEXIBLE FLUSH-JOINT PIPE IN WELL 2015
  • Krasovskij Aleksandr Viktorovich
  • Kustyshev Aleksandr Vasilevich
  • Nemkov Aleksej Vladimirovich
  • Antonov Maksim Dmitrievich
RU2601078C1
METHOD OF DEEP GAS WELL EQUIPMENT WITH TUBING STRING COMPOSITION 2016
  • Nemkov Aleksej Vladimirovich
  • Kustyshev Aleksandr Vasilevich
  • Krasovskij Aleksandr Viktorovich
  • Syrchin Andrej Andreevich
  • Antonov Maksim Dmitrievich
  • Kanashov Vladimir Petrovich
RU2614998C1
UNIVERSAL WELLHEAD PACKER 2013
  • Khasanshin Il'Dar Anvarovich
RU2534690C1
PROCESS OF WELL ABANDONMENT 2002
  • Kustyshev I.A.
  • Kustyshev A.V.
  • Zotov A.S.
  • Gejkhman M.G.
  • Chizhova T.I.
  • Chabaev L.U.
RU2222687C1
METHOD FOR HYDRAULIC FRACTURING OF RESERVOIR IN GAS WELL 2005
  • Kustyshev Aleksandr Vasil'Evich
  • Obidnov Viktor Borisovich
  • Sizov Oleg Vladimirovich
  • Zozulja Grigorij Pavlovich
  • Nemkov Aleksej Vladimirovich
  • Tkachenko Ruslan Vladimirovich
  • Kustyshev Denis Aleksandrovich
RU2301885C1

RU 2 250 978 C1

Authors

Kustyshev A.V.

Godzjur Ja.I.

Chizhova T.I.

Krjakvin D.A.

Dates

2005-04-27Published

2003-10-15Filed