FIELD: oil and gas production.
SUBSTANCE: procedure for construction of well of multi-pay oil field consists in drilling borehole to project depth with opening non-uniform pays of pashiysky horizon, in geo-physical survey, in lowering production string and in its cementing. Drilling is performed without opening a water-bearing section of the pay. At cementing the production string a stop-ring, a device for collar cementing, and a cementing back-throttle valve are located above the pay. Also, integrity of a clay bridge is kept intact between upper and lower pays.
EFFECT: prevention of annulus water flow into well, maintaining collector properties of multi-pay oil field, saving expenditures at construction of well.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF WELLS ON THE TERRIGENOUS DEVONIAN DEPOSITS OF THE ROMASHKINO OIL FIELD | 2020 |
|
RU2745493C1 |
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER | 2012 |
|
RU2490426C1 |
METHOD OF CONSTRUCTING WELL OF MULTILAYER OIL FIELD | 1999 |
|
RU2161239C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE BED | 1996 |
|
RU2118445C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
METHOD OF MULTILAY FIELD DEVELOPMENT | 2012 |
|
RU2505667C1 |
METHOD FOR WELL COMPLETION | 2013 |
|
RU2527978C1 |
METHOD FOR CONSTRUCTION OF WELL FOR MULTIBED OIL DEPOSIT | 2003 |
|
RU2235854C1 |
METHOD FOR WELL CONSTRUCTION | 2008 |
|
RU2354806C1 |
WELL COMPLETION METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2798540C1 |
Authors
Dates
2011-08-27—Published
2010-03-31—Filed