FIELD: building, particularly pile foundation erection.
SUBSTANCE: method involves drilling hole; installing injection pipe in the hole bottom center; installing reinforcement case; injecting cement-and-sand grout through the injection pipe below lower pile end for ground compaction and widened part arrangement; concreting the pile. To create widened part of the pile and to compact ground after concrete hardening cement-and-sand grout is fed under pressure into sealed bag formed of elastic water impermeable material and connected to lower end of ejection pipe so that cement-and-sand grout expands the bag up to reaching necessary bag volume.
EFFECT: increased economy of pile forming, increased ability of clay ground compaction at pile base.
4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PILE FORMING IN PRELIMINARY FORMED WELL | 2002 |
|
RU2231596C2 |
METHOD OF ERECTION OF ARMCO PILE-INJECTOR | 2006 |
|
RU2332540C2 |
METHOD FOR BORED INJECTION PILE ERECTION | 2003 |
|
RU2260093C2 |
METHOD FOR INJECTION PILE BUILDING (VARIANTS) | 2004 |
|
RU2263745C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
METHOD FOR MANUFACTURE OF BORE-INJECTION PILE IN SEASON FROZEN GROUND | 1999 |
|
RU2150550C1 |
METHOD FOR MANUFACTURING A WIDENED CAST-IN-PLACE PILE | 2022 |
|
RU2795418C1 |
MANUFACTURING METHOD OF INCLINED PILE WITH CONTROLLED WIDENING | 2012 |
|
RU2522358C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR ERECTION OF BORED PILE | 2007 |
|
RU2364683C2 |
Authors
Dates
2005-09-20—Published
2003-12-22—Filed