FIELD: power engineering; use of geothermal heat in units using water from external sources.
SUBSTANCE: proposed plant includes vertical delivery well-bore running to earth's crust and vertical outlet well-bore located at some distance from delivery well-bore; provision is made for evacuation of vapor from this well-bore; plant is also provided with horizontal well-bore for connection of two vertical well-bores and at least one section of horizontal well-bore located in hot rock; all said well-bores are provided with casing pipes to exclude contact of liquid flowing through well-bores with soil or underground water; water obtained after condensation of vapor from outlet well-bore is pumped to delivery well-bore and is used repeatedly. Besides that, horizontal well-bore may be entirely located in rock; delivery and outlet well-bores enter hot rock; plant is provided with devices for delivery of water from delivery well-bore to horizontal well-bore. Water admitting to rock is not contaminated in such plant and may be used repeatedly.
EFFECT: enhanced efficiency.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
UTILISATION PLANT OF GEOTHERMAL ENERGY OF UNDERGROUND LOW-TEMPERATURE MINE ROCKS | 2010 |
|
RU2430312C1 |
SYSTEM AND METHOD FOR ROCK FRACTURING IN DENSE ROCK STRATA | 2011 |
|
RU2574425C2 |
METHOD OF PETROTHERMAL HEAT EXTRACTING | 2018 |
|
RU2701029C1 |
METHOD OF EXTRACTING LOW-TEMPERATURE PETROTHERMAL HEAT | 2023 |
|
RU2823425C1 |
GEOTHERMAL SYSTEM FOR GENERATION OF ELECTRIC POWER | 1996 |
|
RU2162991C2 |
METHOD FOR DEVELOPMENT OF PARAFFIN OIL POOL | 1996 |
|
RU2099514C1 |
SYSTEM AND METHOD OF ELECTRIC POWER GENERATION USING HYBRID GEOTHERMAL POWER PLANT CONTAINING NUCLEAR POWER PLANT | 2012 |
|
RU2599786C2 |
BOREHOLE HEAT SUPPLY SYSTEM WITH UNDERGROUND HEAT-HYDRO-ACCUMULATION | 2008 |
|
RU2371638C1 |
METHOD FOR DEVELOPMENT OF PARAFFINED OIL DEPOSIT | 1996 |
|
RU2102588C1 |
METHOD OF USAGE GEOTHERMAL ENERGY "FILL WELL" | 2006 |
|
RU2341736C2 |
Authors
Dates
2005-09-20—Published
2001-07-25—Filed