FIELD: mining.
SUBSTANCE: in compliance with one version, one or several wells are drilled to collector. Note here that every well comprises the main borehole with two or several side holes drilled from the main borehole. One or several blast charges are placed in two or several lateral boreholes. Blast charges are blown up to develop pressure pulses that partially break the rock between two or several lateral boreholes. Blasts are timed so that one or several pressure pulses from different lateral boreholes interact.
EFFECT: higher efficiency of rock fracturing.
22 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EFFICIENCY IMPROVEMENT IN INJECTION AND INTENSIFICATION OF OIL AND GAS PRODUCTION | 2009 |
|
RU2567877C2 |
PROCEDURE FOR FIRING PERFORATION HOLES IN UNDERGROUND FORMATION | 2007 |
|
RU2411353C2 |
PROCEDURE FOR INCREASED PRODUCTION OF METHANE FROM COAL BEARING STRATA BY RAPID OXIDATION (VERSIONS) | 2007 |
|
RU2427707C2 |
METHOD FOR BREAKAGE OF ROCKS | 1989 |
|
SU1757266A1 |
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING | 2008 |
|
RU2489571C2 |
FACILITY AND METHODS FOR REMOVING FILTER CAKE FROM UNCASED BOREHOLE OF WELL | 2005 |
|
RU2360100C2 |
ROCK DESTRUCTION DEVICE | 2011 |
|
RU2519318C1 |
FLUIDS AND METHOD INCLUDING NANOCELLULOSE | 2013 |
|
RU2636526C2 |
EXPLOSIVE GRANULE | 2012 |
|
RU2612177C2 |
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE | 2003 |
|
RU2352769C2 |
Authors
Dates
2016-02-10—Published
2011-02-17—Filed