FIELD: mining.
SUBSTANCE: proposed plant includes the following component parts which form continuous path: injection well for cold water pumping, heating section in mine rock and outlet well; turbogenerator connected to the latter for steam conversion to electric energy; in-series connected steam condenser, collecting tank for condensed water and cleaning plant connected to injection well. Injection well is inclined; heating section is located in mine rock at the depth of 3-5 km horizontally as far as possible or close to horizontal position, for water heating on surface and steam generation there used is chain of in-series connected solar battery, electric heater and/or heat exchanger with low-temperature boiling liquid, which are connected through an outlet to turbogenerator.
EFFECT: plant allows effective use of geothermal energy in any regions where there is no access to hot temperature layers and enlarges its application capabilities.
1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| HELIO-GEOTHERMAL STATION, AND ITS OPERATION METHOD | 2011 |
|
RU2459157C1 |
| CONSTRUCTION METHOD OF UNDERGROUND STORAGE TANK IN ROCKY SOILS | 2010 |
|
RU2425978C1 |
| UNDERGROUND NUCLEAR POWER COMPLEX | 2012 |
|
RU2510088C1 |
| METHOD OF EXTRACTING LOW-TEMPERATURE PETROTHERMAL HEAT | 2023 |
|
RU2823425C1 |
| METHOD OF PETROTHERMAL HEAT EXTRACTING | 2018 |
|
RU2701029C1 |
| HEAT-AND-POWER GENERATING AND INDUSTRIAL WASTE PROCESSING COMPLEX | 2000 |
|
RU2165658C1 |
| METHOD AND DEVICE FOR OPERATING HEAT AND WATER SUPPLY SYSTEM | 1997 |
|
RU2132024C1 |
| METHOD OF USAGE GEOTHERMAL ENERGY "FILL WELL" | 2006 |
|
RU2341736C2 |
| METHOD FOR EXTRACTION OF THERMAL ENERGY IN OIL DEPOSIT | 2018 |
|
RU2683452C1 |
| HELIOGEOTHERMAL POWER COMPLEX | 2020 |
|
RU2749471C1 |
Authors
Dates
2011-09-27—Published
2010-02-01—Filed