METHOD OF AND DEVICE FOR MOUNTING TOWER CRANE SECTIONAL BOOM Russian patent published in 2005 - IPC

Abstract RU 2263623 C2

FIELD: mechanical engineering; tower cranes.

SUBSTANCE: according to proposed method of mounting, first part of boom assembled of sections is placed separately on mounting platform with first part of guy system placed on boom part in pre-mounting position, then mounting tie-rod is placed and is connected by one end with end of first part of boom, and by second end, with links of said part of guy system, then first part of boom is lifted for connection of boom and first part of guy system with head. Then first section of boom is lowered to tensioning of mounting tie-rod. Second part of boom is assembled on mounting platform and second part of guy system is placed on boom part, after which second part of boom with fitted-on second part of guy system is lifted. Second part of boom is lifted with inclination to side of head. Then second part of boom is hinge-connected with part of boom by connecting upper adjacent members of these parts, free ends of first and second parts of guy system are interconnected, and second part of boom is lowered to close butt-joined surfaces of first and second part of boom. In device for implementing the method using mounting tie-rod whose one end is coupled with end of first part of boom, hinge coupling of links of first part of guy system is made in form of sector with three holes, two of which are connected with links of first part of guy system, and third hole is coupled with second end of mounting tie-rod whose end connected with sector is provided with longitudinal slot for connecting member. Guy system made up of two parts is connected with second part of boom.

EFFECT: reduced labor input at mounting of sectional boom.

3 cl, 11 dwg

Similar patents RU2263623C2

Title Year Author Number
TOWER CRANE 1999
  • Pashkovskij A.P.
  • Glazkov V.S.
  • Lunden E.E.
  • Indenbaum A.I.
  • Leonov P.A.
RU2166471C2
TOWER CRANE AND METHOD OF ITS MOUNTING 1998
  • Lunden E.E.
  • Indenbaum A.I.
  • Radzinskij V.I.
  • Merkin K.V.
  • Leonov P.A.
  • Markelov B.A.
  • Stepanov A.I.
  • Gotovtsev V.A.
  • Grigor'Ev V.M.
RU2225346C2
TOWER CRANE AND METHOD OF ITS MOUNTING 2001
  • Stepanov A.I.
  • Radzinskij V.I.
  • Lunden E.E.
  • Indenbaum A.I.
  • Merkin K.V.
  • Leonov P.A.
RU2225345C2
TOWER CRANE AND METHOD FOR ITS ASSEMBLY 2008
  • Marysaev Boris Kleonikovich
RU2371374C1
TOWER CRANE AND METHOD OF ITS MOUNTING AND DEMOUNTING 2001
  • Lunden E.E.
  • Indenbaum A.I.
  • Radzinskij V.I.
RU2225344C2
TOWER CRANE 2011
  • Marysaev Boris Kleonikovich
RU2492132C2
TOWER CRANE 2003
  • Marysaev B.K.
RU2249559C1
TOWER CRANE BOOM 2000
  • Lunden E.E.
  • Markelov B.A.
  • Leonov P.A.
  • Merkin K.V.
  • Pashkovskij A.P.
  • Indenbaum A.I.
RU2225830C2
METHOD OF MOUNTING TOWER CRANE WITH UPPER PART FOLDABLE IN TRAVELING POSITION 2005
  • Marysaev Boris Kleonikovich
RU2299173C1
TOWER CRANE BOOM 2000
  • Markelov B.A.
  • Merkin K.V.
  • Leonov P.A.
  • Lunden E.E.
  • Indenbaum A.I.
  • Pashkovskij A.P.
RU2225831C2

RU 2 263 623 C2

Authors

Lunden E.E.

Leonov P.A.

Indenbaum A.I.

Dates

2005-11-10Published

2004-01-15Filed