FIELD: railway transport.
SUBSTANCE: invention relates to reconstruction of railways with change of track gauge. Method of changing track from one gauge to another, for instance, from narrow gauge to broad gauge and vice versa, comes to the following: changing is carried out without interruptions of operation of railway in preparatory period for changing over trains from one gauge to the other by replacing two-line track skeleton by four-line or three-line with correction of train diagram to pass work trains. To change over from one track gauge to the other, movement of freight and passenger trains is stopped for designed time with preliminary bringing the rolling stock to stations equipped for re-placing of car bogies by those corresponding to new track gauge. Railways are changed from narrow gauge of 1067 mm, to standard gauge of 1520 mm.
EFFECT: possibility of carrying out main jobs for changing track gauges without stopping freight and passenger carriages.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
TRACK OF RECTILINEAR HIGH-SPEED RAILWAY | 2015 |
|
RU2592178C1 |
METHOD OF CONSTRUCTION AND REPAIR OF CONTINUOUS WELDED RAIL, TRACK PANEL AND TRACK LAYING SYSTEM FOR ITS REALISATION | 2014 |
|
RU2572485C1 |
RAIL TRACK OF STRAIGHTLINE HIGH-SPEED RAILWAY | 2016 |
|
RU2640334C1 |
METHOD FOR COUPLING RAILS OF SECTIONAL WAY | 1990 |
|
RU2037597C1 |
RAIL TRACK OF STRAIGHT HIGH-SPEED RAILWAY | 2014 |
|
RU2553490C1 |
INCREASING LIFE OF ELEMENTS IN SYSTEM WHEEL-RAIL AND PROFILES OF TRACK AND RAILWAY WHEEL RIM SELECTED PROCEEDING THEREFROM | 2013 |
|
RU2568819C2 |
BENCH TO TEST TRIPLE SLEEPER FOR CYCLIC AND STATIC FATIGUE STRENGTH | 2013 |
|
RU2539835C1 |
TRACTOR TRACK LAYER | 2023 |
|
RU2808047C1 |
FIXING BLOCK FOR SECURING DIAGRAM OF SLEEPERS OF RAILWAY TRACK FOR HIGH-SPEED NETWORKS, LONG-DISTANCE AND HEAVY TRAIN TRAFFIC | 2020 |
|
RU2751167C1 |
FOUR-AXLE RAILWAY BOGIE | 2012 |
|
RU2566834C1 |
Authors
Dates
2005-11-10—Published
2003-12-18—Filed