FIELD: construction.
SUBSTANCE: in head of each rail or in whip, butt welded, rectangular cavity is made from one side. From the other side of each rail or whip there is a rectangular cantilever beam. Rail is declined behind the joint. Rectangular cantilever beam is located in rectangular cavity of the head of the next rail. Gap is made between the end of the beam and rear wall of the cavity. Rails are connected to sleepers. Sleepers are installed with support on the reinforced concrete slabs and piles. Piles with steel reinforcing frames are installed in wells and filled with concrete. Reinforced concrete slabs with steel welded frames are made of reinforcing bars. Welded steel frames of piles are connected with steel welded frames of slabs. Welded steel frames of cross ridge partitions are filled with concrete. The cavities between the reinforced concrete slabs and partitions are filled with ballast, for example with rubble.
EFFECT: creation of rail track with comfortable conditions for person at high travelling speeds of electric train and safe operation of railway transport.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
TRACK OF RECTILINEAR HIGH-SPEED RAILWAY | 2015 |
|
RU2592178C1 |
RAIL TRACK OF STRAIGHTLINE HIGH-SPEED RAILWAY | 2016 |
|
RU2640334C1 |
DEVICE FOR PROTECTION OF RAILWAY RAILS AGAINST HEATING AND COOLING | 2014 |
|
RU2555058C1 |
HIGH-SPEED NON-POLLUTING POWER-SAVING SAFE ELECTRIC TRAIN | 2013 |
|
RU2544440C1 |
ENERGY-EFFICIENT, ECOLOGICALLY CLEAN AND SAFE HIGH-SPEED ELECTRIC TRAIN | 2013 |
|
RU2527638C1 |
METHOD FOR INSTALLATION OF PERMANENT WAY | 2007 |
|
RU2352705C1 |
HIGH SPEED ELECTRIC TRAIN, ENERGY-SAVING, ECOLOGICALLY PURE AND SAFE FOR PEOPLE | 2016 |
|
RU2646683C1 |
RAILWAY RAIL LENGTH (VERSIONS) | 2007 |
|
RU2381317C2 |
ENERGY-EFFICIENT, ECOLOGICALLY CLEAN AND SAFE HIGH-SPEED ELECTRIC TRAIN | 2016 |
|
RU2647208C2 |
TRACK UPPER STRUCTURE DESIGN | 2007 |
|
RU2352706C1 |
Authors
Dates
2015-06-20—Published
2014-01-14—Filed