FIELD: railways.
SUBSTANCE: group of inventions relates to the field of the superstructure of the railway track, in particular to the variants of the implementation of the fixing blocks for securing the diagram of the sleepers of the railway track for high-speed networks, long-distance and heavy train traffic. The fixing block is made in form of a profile of variable or constant cross-sectional width. The profile has holes or grooves for fastening to intermediate rail fasteners.
EFFECT: resistance to displacement of the track in the vertical and horizontal planes increases.
117 cl, 66 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION AND REPAIR OF CONTINUOUS WELDED RAIL, TRACK PANEL AND TRACK LAYING SYSTEM FOR ITS REALISATION | 2014 |
|
RU2572485C1 |
REINFORCED CONCRETE SLEEPER FOR INSULATING JOINTS OF SIGNAL CURRENT OF RAIL CIRCUITS WITH PULSE SUPPLY (VERSIONS) | 2018 |
|
RU2700249C1 |
RAILWAY CROSSING AND METHOD OF MAKING REVERBERATIVE PLATES FOR IT | 2019 |
|
RU2700996C1 |
SUPERSTRUCTURE OF A RAILWAY TRACK WITH CONTINUOUS RAIL SUPPORT | 2022 |
|
RU2817708C1 |
PRESTRESSED REINFORCED CONCRETE SLAB FOR RAILWAY ROADS | 2007 |
|
RU2373317C2 |
RAILWAY CROSSING DECK | 2022 |
|
RU2785809C1 |
RAILWAY CROSSING WITH RUBBER-CONTAINING COVERING AND DEVICE FOR MOUNTING RUBBER CONTAINING COVERING | 1999 |
|
RU2177522C2 |
DEVICE FOR SCREWING AND UNSCREWING NUTS (SCREWS) OF INTERMEDIATE RAIL FASTENING OF RAILROAD | 2009 |
|
RU2385377C1 |
BALLAST PRISM FOR HIGH-SPEED HEAVY-TRAFFIC SECTIONS OF CONTINUOUS WELDED RAILROAD TRACK | 2011 |
|
RU2475580C2 |
TRACK STRUCTURE AND METHOD OF ITS ERECTION | 1997 |
|
RU2127786C1 |
Authors
Dates
2021-07-09—Published
2020-09-22—Filed