FIELD: oil production industry, particularly oil field development control.
SUBSTANCE: method involves taking samples from well drilled in jointly developed beds and separately from each bed; determining light absorption and relative oil outputs, wherein the oil samples of each bed are separately taken from neighboring key wells and light absorption factor is determined with respect to asphaltenes contained in taken oil samples in solvent after preliminarily educing thereof from oil; determining mass content of asphaltenes from ratio between asphaltene light absorption and mass asphaltene content in oil to characterize original oil for each sample; determining oil coefficient; determining relative bed outputs from a given mathematical formula.
EFFECT: increased speed of oil output determination, increased measuring accuracy and simplified technical operations.
3 ex, 3 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF RELATIVE OIL PRODUCTION RATES OF JOINTLY OPERATED OIL OBJECTS | 2000 |
|
RU2172403C1 |
WELL RUNNING METHOD | 2006 |
|
RU2304701C1 |
PROCESS OF WORKING OF MULTIPOOL OIL FIELD | 1999 |
|
RU2160362C2 |
METHOD FOR WELL INVESTIGATION USING METHODS FOR DETERMINING AMOUNT OF RESIDUAL EXTRACTED RESERVES OF DEVELOPED DEPOSIT | 2012 |
|
RU2496982C1 |
PROCEDURE FOR EVALUATION OF YIELDS OF JOINTLY OPERATED WELLS | 2009 |
|
RU2397321C1 |
METHOD FOR EXPLORATION OF MULTI-SEAM OIL DEPOSIT WITH RESERVOIRS OF DIFFERENT STRUCTURE TYPE | 1993 |
|
RU2072031C1 |
METHOD FOR DETERMINATION OF RATES OF TWO JOINTLY OPERATED OIL FORMATIONS | 2011 |
|
RU2461709C1 |
METHOD FOR WATERPROOFING WORK IN THE WELL | 2021 |
|
RU2774884C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2010 |
|
RU2429343C1 |
METHOD OF OIL POOL DEVELOPMENT | 2014 |
|
RU2568450C1 |
Authors
Dates
2006-01-20—Published
2004-08-02—Filed